ITAC Assessment: OK1079
ITAC logo
ITAC Assessment: OK1079
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Aircraft simulator modules and software
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $50
M
to 100
M
# of Employees 80
Plant Area 82,000
ft2
Annual Production 110
units
Production Hrs. Annual 2,080
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $118,694 1,079,040
kWh
Natural Gas $16,378 1,601
MMBtu
Waste Disposal Costs
Water Usage $2,749 537
Tgal
Water Disposal $5,048 537
Tgal
TOTAL YEARLY COSTS $142,869
RECOMMENDED SAVINGS* $15,706 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $15,706

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
01 2.4133: Use most efficient type of electric motors $800 $3,624 $800
7,276
kWh
- -
02 2.7224: Reduce space conditioning during non-working hours $7,184 - $1,844
16,752
kWh
- $5,340
-
MMBtu
03 2.7211: Clean and maintain refrigerant condensers and towers $5,711 $3,994 $5,711
51,917
kWh
- -
04 2.7232: Replace existing hvac unit with high efficiency model $763 $10,500 $763
6,936
kWh
- -
05 2.3212: Optimize plant power factor $824 $3,200 - $824 -
06 2.7491: Insulate glazing, walls, ceilings, and roofs $424 $318 $230
2,093
kWh
- $194
-
MMBtu
TOTAL RECOMMENDED $15,706 $21,636 $9,348
84,974
kWh
$824 $5,534
-
MMBtu
TOTAL IMPLEMENTED $15,706 $21,636 $9,348
84,974
kWh
$824 $5,534
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs