Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

102

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Household and institutional furniture manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0311 #08 Y:2004 Install system to collect scrap $6,250 $10,000
NC0311 #07 Y:2004 Optimize lot sizes to reduce inventory carrying costs $242,500 $150,000
NC0311 #06 Y:2004 Utilize higher efficiency lamps and/or ballasts $2,142 $3,555
NC0311 #05 Y:2004 Install / repair insulation on steam lines $4,051 $7,280
NC0311 #04 Y:2004 Eliminate or reduce compressed air usage $23,954 $750
NC0311 #03 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,158 $100
NC0311 #02 Y:2004 Reprocess spent oils on site for re-use $15,075 $4,000
NC0311 #01 Y:2004 Recover waste heat from equipment $5,798 $14,107
MA0572 #09 Y:2004 Repair and eliminate steam leaks $160 $138
MA0572 #08 Y:2004 Install compressor air intakes in coolest locations $644 $2,700
MA0572 #07 Y:2004 Insulate bare equipment $1,200 $2,830
MA0572 #06 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $1,790 $750
MA0572 #05 Y:2004 Recover waste heat from equipment $1,923 $3,540
MA0572 #04 Y:2004 Eliminate or reduce compressed air usage $6,068 $18,390
MA0572 #03 Y:2004 Utilize higher efficiency lamps and/or ballasts $11,380 $81,540
MA0572 #02 Y:2004 Recover waste heat from equipment $15,571 $4,080
MA0572 #01 Y:2004 Reduce space conditioning during non-working hours $39,353 $1,300
NC0310 #08 Y:2004 Eliminate leaks in inert gas and compressed air lines/ valves $509 $100
NC0310 #07 Y:2004 Utilize higher efficiency lamps and/or ballasts $339 $616
NC0310 #06 Y:2004 Turn off equipment when not in use $1,830 $875