Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Wood furniture
NAICS 337122: Nonupholstered Wood Household Furniture Manufacturing
SIC 2511: Wood Household Furniture, Except Upholstered
Sales Range $5
M
to 10
M
# of Employees 73
Plant Area 100,000
ft2
Annual Production 13,520
pieces
Production Hrs. Annual 2,210
hrs
Location (State) Connecticut

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $78,909 1,215,360
kWh
Electricity Demand $47,866 11,140
kW-mo/yr
LPG $5,060 350
MMBtu
Fuel Oil #2 $97,335 11,003
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $78,089 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $78,089

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings
01 2.7224: Reduce space conditioning during non-working hours $39,353 $1,300 - - - $39,353
-
MMBtu
02 2.2437: Recover waste heat from equipment $15,571 $4,080 $(-569.0)
(-8,400)
kWh
$(-101.0)
-
kW-mo/yr
- $16,241
-
MMBtu
03 2.7142: Utilize higher efficiency lamps and/or ballasts $11,380 $81,540 $7,065
94,320
kWh
$4,315
-
kW-mo/yr
- -
04 2.4239: Eliminate or reduce compressed air usage $6,068 $18,390 $3,767
50,300
kWh
$2,301
-
kW-mo/yr
- -
05 2.2437: Recover waste heat from equipment $1,923 $3,540 - - $1,923
-
MMBtu
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,790 $750 $1,790
23,905
kWh
- - -
07 2.2511: Insulate bare equipment $1,200 $2,830 - - - $1,200
-
MMBtu
08 2.4221: Install compressor air intakes in coolest locations $644 $2,700 $644
8,600
kWh
- - -
09 2.2135: Repair and eliminate steam leaks $160 $138 - - - $160
-
MMBtu
TOTAL RECOMMENDED $78,089 $115,268 $12,697
168,725
kWh
$6,515
-
kW-mo/yr
$1,923
-
MMBtu
$56,954
-
MMBtu
TOTAL IMPLEMENTED $78,089 $115,268 $12,697
168,725
kWh
$6,515
-
kW-mo/yr
$1,923
-
MMBtu
$56,954
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Fuel Oil #2 Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs