Assessment Year | 1982 |
---|---|
Principal Product | READY-MIXED CONCRETE |
NAICS |
n/a
|
SIC | 3273: Ready-Mixed Concrete |
Sales Range | $1 M to 5M |
# of Employees | 24 |
Plant Area |
n/a
|
Annual Production | 70,000
pieces
|
Production Hrs. Annual | 2,717
hrs
|
Location (State) | Kansas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $8,099 | 134,525 |
kWh
|
$0.060 |
Natural Gas | $4,600 | 1,601 |
MMBtu
|
$2.87 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $3,180 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,385 | $2,427 |
$1,385
23,154
kWh
|
- | |
02 | 2.7447: Install vinyl strip / high speed / air curtain doors | $810 | $335 | - |
$810
-
MMBtu
|
|
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $495 | - |
$495
8,206
kWh
|
- | |
04 | 2.6121: Reduce hot water temperature to the minimum required | $300 | $400 | - |
$300
-
MMBtu
|
|
05 | 2.1233: Analyze flue gas for proper air/fuel ratio | $190 | $200 | - |
$190
-
MMBtu
|
|
TOTAL RECOMMENDED | $3,180 | $3,362 |
$1,880
31,360
kWh
|
$1,300
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs