ITAC Assessment: KU0038
ITAC logo
ITAC Assessment: KU0038
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1982
Principal Product READY-MIXED CONCRETE
NAICS
n/a
SIC 3273: Ready-Mixed Concrete
Sales Range $1
M
to 5
M
# of Employees 24
Plant Area
n/a
Annual Production 70,000
pieces
Production Hrs. Annual 2,717
hrs
Location (State) Kansas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $8,099 134,525
kWh
Natural Gas $4,600 1,601
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $3,180 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,385 $2,427 $1,385
23,154
kWh
-
02 2.7447: Install vinyl strip / high speed / air curtain doors $810 $335 - $810
-
MMBtu
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $495 - $495
8,206
kWh
-
04 2.6121: Reduce hot water temperature to the minimum required $300 $400 - $300
-
MMBtu
05 2.1233: Analyze flue gas for proper air/fuel ratio $190 $200 - $190
-
MMBtu
TOTAL RECOMMENDED $3,180 $3,362 $1,880
31,360
kWh
$1,300
-
MMBtu
TOTAL IMPLEMENTED - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs