ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
UW2214 #03 Y:2022 | 03 | 2022 | Reduce space conditioning during non-working hours | $3,014 | - | |
UW2214 #02 Y:2022 | 02 | 2022 | Install occupancy sensors | $843 | $970 | |
UW2214 #01 Y:2022 | 01 | 2022 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,351 | $2,080 | |
UD1021 #11 Y:2020 | 11 | 2020 | Make a practice of turning off lights when not needed | $249 | $240 | |
UD1021 #10 Y:2020 | 10 | 2020 | Utilize higher efficiency lamps and/or ballasts | $10,902 | $7,800 | |
UD1021 #09 Y:2020 | 09 | 2020 | Install occupancy sensors | $16,106 | $2,800 | |
UD1021 #08 Y:2020 | 08 | 2020 | Utilize higher efficiency lamps and/or ballasts | $24,419 | $37,053 | |
UD1021 #07 Y:2020 | 07 | 2020 | Size electric motors for peak operating efficiency | $8,594 | $1,590 | |
UD1021 #06 Y:2020 | 06 | 2020 | Install compressor air intakes in coolest locations | $4,902 | $2,000 | |
UD1021 #05 Y:2020 | 05 | 2020 | Reduce the pressure of compressed air to the minimum required | $6,841 | - | |
UD1021 #04 Y:2020 | 04 | 2020 | Eliminate leaks in inert gas and compressed air lines/ valves | $8,342 | - | |
UD1021 #03 Y:2020 | 03 | 2020 | Meter recycled water (to reduce sewer charges) | $5,965 | $1,400 | |
UD1021 #02 Y:2020 | 02 | 2020 | Recharge batteries on during off-peak demand periods | $32,724 | - | |
UD1021 #01 Y:2020 | 01 | 2020 | Turn off equipment during breaks, reduce operating time | $10,283 | - | |
UD0906 #09 Y:2014 | 09 | 2014 | Lease / purchase baler; sell cardboard to recycler | $58,357 | $14,000 | |
UD0906 #08 Y:2014 | 08 | 2014 | Reduce the pressure of compressed air to the minimum required | $618 | - | |
UD0906 #07 Y:2014 | 07 | 2014 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,271 | $1,000 | |
UD0906 #06 Y:2014 | 06 | 2014 | Recover waste heat from equipment | $1,456 | $5,614 | |
UD0906 #05 Y:2014 | 05 | 2014 | Utilize a less expensive cooling method | $5,162 | $10,000 | |
UD0906 #04 Y:2014 | 04 | 2014 | Install occupancy sensors | $2,954 | $1,575 |