Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

176

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other transportation equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
KS2432 #06 Y:2024 Use solar heat to make electricty $191,327 $1,288,000
KS2432 #05 Y:2024 Utilize higher efficiency lamps and/or ballasts $6,859 $26,012
KS2432 #04 Y:2024 Install occupancy sensors $3,811 $12,700
KS2432 #03 Y:2024 Turn off equipment during breaks, reduce operating time $8,117 -
KS2432 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $3,611 $60
KS2432 #01 Y:2024 Eliminate leaks in inert gas and compressed air lines/ valves $20,507 $6,920
MS0429 #03 Y:2024 Eliminate or reduce compressed air usage $16,143 -
MS0429 #02 Y:2024 Use solar heat to make electricty $5,847 $35,728
MS0429 #01 Y:2024 Utilize higher efficiency lamps and/or ballasts $2,731 $8,233
MS0428 #03 Y:2024 Optimize plant power factor $788 $1,677
MS0428 #02 Y:2024 Reduce the pressure of compressed air to the minimum required $647 -
MS0428 #01 Y:2024 Use solar heat to make electricty $11,631 $131,059
UW2214 #03 Y:2022 Reduce space conditioning during non-working hours $3,014 -
UW2214 #02 Y:2022 Install occupancy sensors $843 $970
UW2214 #01 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $1,351 $2,080
SU0519 #10 Y:2022 Install occupancy sensors $149 $746
SU0519 #09 Y:2022 Implement a regular maintenance program to reduce emissions from leaky valves and pipe fittings $312 $1,100
SU0519 #08 Y:2022 Eliminate or reduce compressed air usage $244 $479
SU0519 #07 Y:2022 Utilize higher efficiency lamps and/or ballasts $1,214 $498
SU0519 #06 Y:2022 Reschedule plant operations or reduce load to avoid peaks $3,357 $675