ITAC Assessment: KS2432
ITAC logo
ITAC Assessment: KS2432
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2024
Principal Product Golf Carts
NAICS 336999: All Other Transportation Equipment Manufacturing
SIC 3369: Nonferrous Foundries, Except Aluminum and Copper
Sales Range greater than $500
M
# of Employees 1,900
Plant Area 908,000
ft2
Annual Production 210,000
units
Production Hrs. Annual 3,840
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,711,762 13,631,176
kWh
Natural Gas $329,501 58,433
MMBtu
Waste Disposal Costs
Water Usage $35,128 8,651
Tgal
Water Disposal $39,699 8,651
Tgal
TOTAL YEARLY COSTS $2,116,090
RECOMMENDED SAVINGS* $234,232 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,507 $6,920 $20,507
162,751
kWh
-
02 2.4231: Reduce the pressure of compressed air to the minimum required $3,611 $60 $3,611
28,655
kWh
-
03 2.6212: Turn off equipment during breaks, reduce operating time $8,117 - $8,117
64,420
kWh
-
04 2.7135: Install occupancy sensors $3,811 $12,700 $3,426
27,187
kWh
$385
05 2.7142: Utilize higher efficiency lamps and/or ballasts $6,859 $26,012 $4,413
35,021
kWh
$2,446
06 2.9114: Use solar heat to make electricty $191,327 $1,288,000 $191,327
1,518,466
kWh
-
TOTAL RECOMMENDED $234,232 $1,333,692 $231,401
1,836,500
kWh
$2,831
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs