| Assessment Year | 2024 |
|---|---|
| Principal Product | Golf Carts |
| NAICS | 336999: All Other Transportation Equipment Manufacturing |
| SIC | 3369: Nonferrous Foundries, Except Aluminum and Copper |
| Sales Range | greater than $500 M |
| # of Employees | 1,900 |
| Plant Area |
908,000
ft2
|
| Annual Production | 210,000
units
|
| Production Hrs. Annual | 3,840
hrs
|
| Location (State) | Georgia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $1,711,762 | 13,631,176 |
kWh
|
$0.13 | |
| Natural Gas | $329,501 | 58,433 |
MMBtu
|
$5.64 | |
| Waste Disposal Costs | |||||
| Water Usage | $35,128 | 8,651 |
Tgal
|
$4.06 | |
| Water Disposal | $39,699 | 8,651 |
Tgal
|
$4.59 | |
| TOTAL YEARLY COSTS | $2,116,090 | ||||
| RECOMMENDED SAVINGS* | $234,232 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,507 | $6,920 |
$20,507
162,751
kWh
|
- | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,611 | $60 |
$3,611
28,655
kWh
|
- | |
| 03 | 2.6212: Turn off equipment during breaks, reduce operating time | $8,117 | - |
$8,117
64,420
kWh
|
- | |
| 04 | 2.7135: Install occupancy sensors | $3,811 | $12,700 |
$3,426
27,187
kWh
|
$385 | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $6,859 | $26,012 |
$4,413
35,021
kWh
|
$2,446 | |
| 06 | 2.9114: Use solar heat to make electricty | $191,327 | $1,288,000 |
$191,327
1,518,466
kWh
|
- | |
| TOTAL RECOMMENDED | $234,232 | $1,333,692 |
$231,401
1,836,500
kWh
|
$2,831 | ||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Administrative Changes Savings | |||