Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

86

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Aerospace product and parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UU0194 #06 Y:2021 Install compressor air intakes in coolest locations $896 $1,796
UU0194 #05 Y:2021 Install heat pipes / raise cooling setpoint $1,788 $2,208
UU0194 #04 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $5,610 $23,208
UU0194 #03 Y:2021 Analyze flue gas for proper air/fuel ratio $25,369 $20,108
UU0194 #02 Y:2021 Utilize higher efficiency lamps and/or ballasts $37,721 $113,682
UU0194 #01 Y:2021 Use heat from boiler blowdown to preheat boiler feed water $39,902 $83,130
UU0192 #08 Y:2021 Change rate schedules or other changes in utility service $464 $100
UU0192 #07 Y:2021 Install compressor air intakes in coolest locations $1,064 $4,892
UU0192 #06 Y:2021 Turn off equipment when not in use $4,269 $1,000
UU0192 #05 Y:2021 Install occupancy sensors $2,978 $3,520
UU0192 #04 Y:2021 Optimize plant power factor $3,945 $5,606
UU0192 #03 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $4,994 $15,475
UU0192 #02 Y:2021 Use adjustable frequency drive or multiple speed motors on existing system $28,872 $40,613
UU0192 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $52,219 $52,219
UU0142 #07 Y:2018 Lower temperature during the winter season and vice-versa $288 $100
UU0142 #06 Y:2018 Reduce the pressure of compressed air to the minimum required $810 $129
UU0142 #05 Y:2018 Install occupancy sensors $1,532 -
UU0142 #04 Y:2018 Eliminate leaks in inert gas and compressed air lines/ valves $1,661 -
UU0142 #03 Y:2018 Optimize plant power factor $1,742 $2,500
UU0142 #02 Y:2018 Utilize higher efficiency lamps and/or ballasts $6,981 $14,585