matching recommendations| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UU0194 #06 Y:2021 | 06 | 2021 | Install compressor air intakes in coolest locations | $896 | $1,796 | |
| UU0194 #05 Y:2021 | 05 | 2021 | Install heat pipes / raise cooling setpoint | $1,788 | $2,208 | |
| UU0194 #04 Y:2021 | 04 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $5,610 | $23,208 | |
| UU0194 #03 Y:2021 | 03 | 2021 | Analyze flue gas for proper air/fuel ratio | $25,369 | $20,108 | |
| UU0194 #02 Y:2021 | 02 | 2021 | Utilize higher efficiency lamps and/or ballasts | $37,721 | $113,682 | |
| UU0194 #01 Y:2021 | 01 | 2021 | Use heat from boiler blowdown to preheat boiler feed water | $39,902 | $83,130 | |
| UU0192 #08 Y:2021 | 08 | 2021 | Change rate schedules or other changes in utility service | $464 | $100 | |
| UU0192 #07 Y:2021 | 07 | 2021 | Install compressor air intakes in coolest locations | $1,064 | $4,892 | |
| UU0192 #06 Y:2021 | 06 | 2021 | Turn off equipment when not in use | $4,269 | $1,000 | |
| UU0192 #05 Y:2021 | 05 | 2021 | Install occupancy sensors | $2,978 | $3,520 | |
| UU0192 #04 Y:2021 | 04 | 2021 | Optimize plant power factor | $3,945 | $5,606 | |
| UU0192 #03 Y:2021 | 03 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $4,994 | $15,475 | |
| UU0192 #02 Y:2021 | 02 | 2021 | Use adjustable frequency drive or multiple speed motors on existing system | $28,872 | $40,613 | |
| UU0192 #01 Y:2021 | 01 | 2021 | Utilize higher efficiency lamps and/or ballasts | $52,219 | $52,219 | |
| UU0142 #07 Y:2018 | 07 | 2018 | Lower temperature during the winter season and vice-versa | $288 | $100 | |
| UU0142 #06 Y:2018 | 06 | 2018 | Reduce the pressure of compressed air to the minimum required | $810 | $129 | |
| UU0142 #05 Y:2018 | 05 | 2018 | Install occupancy sensors | $1,532 | - | |
| UU0142 #04 Y:2018 | 04 | 2018 | Eliminate leaks in inert gas and compressed air lines/ valves | $1,661 | - | |
| UU0142 #03 Y:2018 | 03 | 2018 | Optimize plant power factor | $1,742 | $2,500 | |
| UU0142 #02 Y:2018 | 02 | 2018 | Utilize higher efficiency lamps and/or ballasts | $6,981 | $14,585 |