ITAC Assessment: UU0142
ITAC logo
ITAC Assessment: UU0142
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Composite Parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 110
Plant Area 101,500
ft2
Annual Production 3,140
pieces
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $91,553 2,503,839
kWh
Electricity Demand $78,586 4,695
kW-mo/yr
Electricity Fees $34,066 -
Natural Gas $29,330 3,651
MMBtu
Waste Disposal Costs
Water Usage $10,569 1,467
Tgal
TOTAL YEARLY COSTS $244,104
RECOMMENDED SAVINGS* $23,670 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,461

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.8121: Apply for tax-free status for energy purchases $10,657 $600 - - $10,657
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,981 $14,585 $4,024
109,639
kWh
$2,957
-
kW-mo/yr
-
03 2.3212: Optimize plant power factor $1,742 $2,500 - - $1,742
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,661 - $1,022
27,857
kWh
$638
-
kW-mo/yr
-
05 2.7135: Install occupancy sensors $1,532 - $1,532
41,750
kWh
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $810 $129 $498
13,578
kWh
$311
-
kW-mo/yr
-
07 2.7221: Lower temperature during the winter season and vice-versa $288 $100 $213
5,742
kWh
$75
-
kW-mo/yr
-
TOTAL RECOMMENDED $23,670 $17,914 $7,290
198,566
kWh
$3,981
-
kW-mo/yr
$12,399
TOTAL IMPLEMENTED $10,461 $14,685 $6,791
184,988
kWh
$3,670
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs