ITAC Assessment: IA0417
ITAC logo
ITAC Assessment: IA0417
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2007
Principal Product Data Storage Devices
NAICS 334112: Computer Storage Device Manufacturing
SIC 3572: Computer Storage Devices
Sales Range greater than $500
M
# of Employees 390
Plant Area 368,000
ft2
Annual Production 2,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,975,606 45,682,560
kWh
Electricity Demand $495,770 72,636
kW-mo/yr
Natural Gas $354,793 52,200
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $72,945 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $36,598 $46,276 $30,058
697,394
kWh
$6,540
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,956 $13,071 $3,171
73,574
kWh
$785
-
kW-mo/yr
03 2.7135: Install occupancy sensors $1,650 $1,078 $1,650
38,263
kWh
-
04 2.7131: Add area lighting switches $7,664 $1,875 $7,664
177,793
kWh
-
05 2.7142: Utilize higher efficiency lamps and/or ballasts $2,033 $3,978 $2,033
47,174
kWh
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $21,044 $2,000 $17,282
400,982
kWh
$3,762
-
kW-mo/yr
TOTAL RECOMMENDED $72,945 $68,278 $61,858
1,435,180
kWh
$11,087
-
kW-mo/yr
TOTAL IMPLEMENTED - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs