ITAC Assessment: UU0192
ITAC logo
ITAC Assessment: UU0192
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product stringers and frames for commercial airplanes
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 1,500
Plant Area 615,000
ft2
Annual Production 36
units
Production Hrs. Annual 8,760
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $935,021 26,022,921
kWh
Electricity Demand $975,042 56,689
kW-mo/yr
Electricity Fees $175,886 -
Natural Gas $348,786 70,870
MMBtu
TOTAL YEARLY COSTS $2,434,735
RECOMMENDED SAVINGS* $98,806 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $94,072

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $52,219 $52,219 $31,579
877,183
kWh
$20,640
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $28,872 $40,613 $15,456
429,334
kWh
$13,416
-
kW-mo/yr
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $4,994 $15,475 $2,758
76,485
kWh
$2,236
-
kW-mo/yr
- -
04 2.3212: Optimize plant power factor $3,945 $5,606 - - $3,945 -
05 2.7135: Install occupancy sensors $2,978 $3,520 $2,978
82,879
kWh
- - -
06 2.6218: Turn off equipment when not in use $4,269 $1,000 $1,849
51,364
kWh
$2,420
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $1,064 $4,892 $643
17,888
kWh
$421
-
kW-mo/yr
- -
08 2.8114: Change rate schedules or other changes in utility service $464 $100 - - - $464
TOTAL RECOMMENDED $98,806 $123,425 $55,263
1,535,132
kWh
$39,134
-
kW-mo/yr
$3,945 $464
TOTAL IMPLEMENTED $94,072 $122,325 $53,414
1,483,769
kWh
$36,713
-
kW-mo/yr
$3,945 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs