ITAC Assessment: MS0255
ITAC logo
ITAC Assessment: MS0255
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Fuel Injectors
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area 244,971
ft2
Annual Production 4,000,000
pieces
Production Hrs. Annual 7,344
hrs
Location (State) Mississippi

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $975,241 36,379,200
kWh
Electricity Demand $646,656 62,328
kW-mo/yr
Electricity Fees $32,378 -
Natural Gas $87,282 11,154
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $46,856 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $14,124 $23,073 $9,067
350,908
kWh
$4,848
-
kW-mo/yr
$209
02 2.4221: Install compressor air intakes in coolest locations $7,517 $2,756 $3,992
154,497
kWh
$3,414
-
kW-mo/yr
$111
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $7,202 $372 $7,096
274,595
kWh
- $106
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,343 $2,164 $3,816
147,659
kWh
$2,434
-
kW-mo/yr
$93
05 2.7124: Make a practice of turning off lights when not needed $5,775 $4,524 $5,689
220,173
kWh
- $86
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $3,953 $8,984 $3,895
150,727
kWh
- $58
07 2.7229: Air condition only space necessary $1,768 $600 $429
16,610
kWh
$1,313
-
kW-mo/yr
$26
08 2.8112: Combine utility meters $174 $50 - - $174
TOTAL RECOMMENDED $46,856 $42,523 $33,984
1,315,169
kWh
$12,009
-
kW-mo/yr
$863
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs