ITAC Assessment: UU0194
ITAC logo
ITAC Assessment: UU0194
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Airplane frames and parts
NAICS 336413: Other Aircraft Parts and Auxiliary Equipment Manufacturing
SIC 3728: Aircraft Parts and Auxiliary Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 400
Plant Area 403,000
ft2
Annual Production 30
units
Production Hrs. Annual 8,424
hrs
Location (State) Utah

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $680,744 18,805,839
kWh
Electricity Demand $924,482 52,025
kW-mo/yr
Electricity Fees $152,656 -
Natural Gas $292,781 59,612
MMBtu
TOTAL YEARLY COSTS $2,050,663
RECOMMENDED SAVINGS* $111,286 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $44,227

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.1243: Use heat from boiler blowdown to preheat boiler feed water $39,902 $83,130 - - $39,902
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $37,721 $113,682 $22,198
613,216
kWh
$15,523
-
kW-mo/yr
-
03 2.1233: Analyze flue gas for proper air/fuel ratio $25,369 $20,108 - - $25,369
-
MMBtu
04 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $5,610 $23,208 $3,087
85,281
kWh
$2,523
-
kW-mo/yr
-
05 2.7272: Install heat pipes / raise cooling setpoint $1,788 $2,208 $1,434
39,607
kWh
$354
-
kW-mo/yr
-
06 2.4221: Install compressor air intakes in coolest locations $896 $1,796 $535
14,866
kWh
$361
-
kW-mo/yr
-
TOTAL RECOMMENDED $111,286 $244,132 $27,254
752,970
kWh
$18,761
-
kW-mo/yr
$65,271
-
MMBtu
TOTAL IMPLEMENTED $44,227 $138,686 $25,820
713,363
kWh
$18,407
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs