Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,341

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
GT0859 #03 Y:2008 Change rate schedules or other changes in utility service $14,029 -
GT0859 #02 Y:2008 Use synthetic lubricant $13,504 -
GT0859 #01 Y:2008 Utilize higher efficiency lamps and/or ballasts $54,936 $12,000
UM0346 #09 Y:2008 Reduce space conditioning during non-working hours $548 $280
UM0346 #08 Y:2008 Lower temperature during the winter season and vice-versa $1,284 -
UM0346 #07 Y:2008 Turn off equipment when not in use $1,361 $580
UM0346 #06 Y:2008 Install occupancy sensors $1,706 $2,484
UM0346 #05 Y:2008 Install compressor air intakes in coolest locations $1,880 $515
UM0346 #04 Y:2008 Recharge batteries on during off-peak demand periods $2,161 $3,500
UM0346 #03 Y:2008 Utilize higher efficiency lamps and/or ballasts $2,497 -
UM0346 #02 Y:2008 Utilize higher efficiency lamps and/or ballasts $5,423 $19,322
UM0346 #01 Y:2008 Lower temperature during the winter season and vice-versa $10,849 $500
UM0345 #05 Y:2008 Install compressor air intakes in coolest locations $653 $544
UM0345 #04 Y:2008 Eliminate leaks in inert gas and compressed air lines/ valves $1,336 $460
UM0345 #03 Y:2008 Recharge batteries on during off-peak demand periods $1,558 -
UM0345 #02 Y:2008 Use separate switches on perimeter lighting which may be turned off when natural light is available $8,397 $1,650
UM0345 #01 Y:2008 Utilize higher efficiency lamps and/or ballasts $10,365 $7,499
TT0010 #07 Y:2008 Optimize plant power factor $8,302 $48,000
TT0010 #06 Y:2008 Upgrade controls on compressors $2,625 $5,250
TT0010 #05 Y:2008 Use or replace with energy efficient substitutes $3,200 $11,200