ITAC Assessment: UM0345
ITAC logo
ITAC Assessment: UM0345
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2008
Principal Product instrument panels, headliners, center console
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 228,000
ft2
Annual Production 198,000
pieces
Production Hrs. Annual 4,200
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,069,807 25,800,000
kWh
Natural Gas $412,272 48,054
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,309 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,291

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $10,365 $7,499 $10,365
94,610
kWh
-
02 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $8,397 $1,650 $8,397
100,212
kWh
-
03 2.3132: Recharge batteries on during off-peak demand periods $1,558 - - $1,558
-
kW-mo/yr
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,336 $460 $1,336
11,483
kWh
-
05 2.4221: Install compressor air intakes in coolest locations $653 $544 $653
6,313
kWh
-
TOTAL RECOMMENDED $22,309 $10,153 $20,751
212,618
kWh
$1,558
-
kW-mo/yr
TOTAL IMPLEMENTED $11,291 $2,110 $9,733
111,695
kWh
$1,558
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs