| Assessment Year | 1994 |
|---|---|
| Principal Product | plastic containers |
| NAICS |
n/a
|
| SIC | 3085: Plastics Bottles |
| Sales Range | $10 M to 50M |
| # of Employees | 80 |
| Plant Area |
27,000
ft2
|
| Annual Production | 71,700,000
pieces
|
| Production Hrs. Annual | 8,400
hrs
|
| Location (State) | Ohio |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $462,378 | 9,552,169 |
kWh
|
$0.048 |
| Natural Gas | $12,849 | 2,278 |
MMBtu
|
$5.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $46,835 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $44,989 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Personnel Changes Savings |
|---|---|---|---|---|---|---|
| 01 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $19,945 | $250 |
$19,945
350,234
kWh
|
- | |
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,532 | - |
$2,532
-
kWh
|
- | |
| 03 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,439 | - |
$8,439
-
kWh
|
- | |
| 04 | 2.6221: Use most efficient equipment at it's maximum capacity and less efficient equipment only when necessary | $2,258 | - |
$1,758
82,649
kWh
|
$500 | |
| 05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $11,815 | - |
$11,815
-
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,846 | $4,234 |
$1,846
33,411
kWh
|
- | |
| TOTAL RECOMMENDED | $46,835 | $4,484 |
$46,335
466,294
kWh
|
$500 | ||
| TOTAL IMPLEMENTED | $44,989 | $250 |
$44,489
432,883
kWh
|
$500 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Personnel Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs