ITAC Assessment: OR0190
ITAC logo
ITAC Assessment: OR0190
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product Vegetables
NAICS
n/a
SIC 2037: Frozen Fruits, Fruit Juices, and Vegetables
Sales Range $100
M
to 500
M
# of Employees 700
Plant Area
n/a
Annual Production 71,000
ton
Production Hrs. Annual 6,570
hrs
Location (State) Oregon

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $241,980 6,678,781
kWh
Other Energy $528,151 87,927
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $57,424 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Wood Savings Personnel Changes Savings
01 2.3212: Optimize plant power factor $9,859 $16,500 $9,859
-
kWh
- -
02 2.7124: Make a practice of turning off lights when not needed $844 $102 $217
8,792
kWh
- $627
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,221 $2,291 $550
18,757
kWh
- $671
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $618 - $618
15,826
kWh
- -
05 2.4133: Use most efficient type of electric motors $1,021 $3,716 $1,021
27,257
kWh
- -
06 2.2511: Insulate bare equipment $28,502 $12,113 - $28,502
-
MMBtu
-
07 2.5123: Reduce fluid flow rates $15,359 $65,000 $15,359
620,164
kWh
- -
TOTAL RECOMMENDED $57,424 $99,722 $27,624
690,796
kWh
$28,502
-
MMBtu
$1,298
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Wood Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs