ITAC Assessment: UK1714
ITAC logo
ITAC Assessment: UK1714
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range less than $500
k
# of Employees 8
Plant Area 1,000,000
ft2
Annual Production 11,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $261,473 3,866,400
kWh
Electricity Demand $57,530 8,356
kW-mo/yr
TOTAL YEARLY COSTS $319,003
RECOMMENDED SAVINGS* $26,949 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $26,949

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.6212: Turn off equipment during breaks, reduce operating time $10,460 - $9,185
135,081
kWh
$1,275
-
kW-mo/yr
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,475 $5,000 $6,552
96,358
kWh
$923
-
kW-mo/yr
03 2.7135: Install occupancy sensors $2,092 $1,444 $2,092
30,768
kWh
-
04 2.5123: Reduce fluid flow rates $5,426 - $4,765
70,080
kWh
$661
-
kW-mo/yr
05 2.5194: Redesign process $1,496 $5,533 $8
110
kWh
$1,488
-
kW-mo/yr
TOTAL RECOMMENDED $26,949 $11,977 $22,602
332,397
kWh
$4,347
-
kW-mo/yr
TOTAL IMPLEMENTED $26,949 $11,977 $22,602
332,397
kWh
$4,347
-
kW-mo/yr
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs