ITAC Assessment: ME0175
ITAC logo
ITAC Assessment: ME0175
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Rubber tires
NAICS
n/a
SIC 3011: Tires and Inner Tubes
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 42,000
ft2
Annual Production 450,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $311,027 3,149,766
kWh
LPG $20,465 2,868
MMBtu
Fuel Oil #6 $163,059 54,844
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $59,838 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings Water Consumption Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $14,395 $6,300 $15,059
151,817
kWh
- $(-664.0)
-
MMBtu
- -
02 2.2113: Repair or replace steam traps $12,145 $9,600 - - $12,145
-
MMBtu
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $3,381 $11,381 $3,381
38,101
kWh
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,892 $7,000 $4,652
28,722
kWh
$(-760.0)
-
MMBtu
- - -
05 2.2136: Install / repair insulation on steam lines $2,561 $778 - - $2,561
-
MMBtu
- -
06 2.1233: Analyze flue gas for proper air/fuel ratio $2,317 $400 - - $2,317
-
MMBtu
- -
07 2.8121: Apply for tax-free status for energy purchases $1,093 - - - - $1,093 -
08 2.8121: Apply for tax-free status for energy purchases $563 - - - - $563 -
09 2.2123: Insulate feedwater tank $260 $270 - - $260
-
MMBtu
- -
10 2.2514: Cover open tanks $209 $195 $209
2,931
kWh
- - - -
11 3.4115: Recover and reuse cooling water $19,022 $24,200 - - - - $19,022
-
Tgal
TOTAL RECOMMENDED $59,838 $60,124 $23,301
221,571
kWh
$(-760.0)
-
MMBtu
$16,619
-
MMBtu
$1,656 $19,022
-
Tgal
TOTAL IMPLEMENTED $21,436 $22,624 $3,590
41,032
kWh
- $17,283
-
MMBtu
$563 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Fuel Oil #6 Savings Administrative Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs