Assessment Year | 1995 |
---|---|
Principal Product | Rubber tires |
NAICS |
n/a
|
SIC | 3011: Tires and Inner Tubes |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
42,000
ft2
|
Annual Production | 450,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Maine |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $311,027 | 3,149,766 |
kWh
|
$0.099 |
LPG | $20,465 | 2,868 |
MMBtu
|
$7.14 |
Fuel Oil #6 | $163,059 | 54,844 |
MMBtu
|
$2.97 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $59,838 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $21,436 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $14,395 | $6,300 |
$15,059
151,817
kWh
|
- |
$(-664.0)
-
MMBtu
|
- | - | |
02 | 2.2113: Repair or replace steam traps | $12,145 | $9,600 | - | - |
$12,145
-
MMBtu
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,381 | $11,381 |
$3,381
38,101
kWh
|
- | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,892 | $7,000 |
$4,652
28,722
kWh
|
$(-760.0)
-
MMBtu
|
- | - | - | |
05 | 2.2136: Install / repair insulation on steam lines | $2,561 | $778 | - | - |
$2,561
-
MMBtu
|
- | - | |
06 | 2.1233: Analyze flue gas for proper air/fuel ratio | $2,317 | $400 | - | - |
$2,317
-
MMBtu
|
- | - | |
07 | 2.8121: Apply for tax-free status for energy purchases | $1,093 | - | - | - | - | $1,093 | - | |
08 | 2.8121: Apply for tax-free status for energy purchases | $563 | - | - | - | - | $563 | - | |
09 | 2.2123: Insulate feedwater tank | $260 | $270 | - | - |
$260
-
MMBtu
|
- | - | |
10 | 2.2514: Cover open tanks | $209 | $195 |
$209
2,931
kWh
|
- | - | - | - | |
11 | 3.4115: Recover and reuse cooling water | $19,022 | $24,200 | - | - | - | - |
$19,022
-
Tgal
|
|
TOTAL RECOMMENDED | $59,838 | $60,124 |
$23,301
221,571
kWh
|
$(-760.0)
-
MMBtu
|
$16,619
-
MMBtu
|
$1,656 |
$19,022
-
Tgal
|
||
TOTAL IMPLEMENTED | $21,436 | $22,624 |
$3,590
41,032
kWh
|
- |
$17,283
-
MMBtu
|
$563 | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Fuel Oil #6 Savings | Administrative Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs