| Assessment Year | 2019 |
|---|---|
| Principal Product | metal finishing |
| NAICS | 332813: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| SIC | 3471: Electroplating, Plating, Polishing, Anodizing, and Coloring |
| Sales Range | $5 M to 10M |
| # of Employees | 135 |
| Plant Area |
35,000
ft2
|
| Annual Production | 500,000
lb
|
| Production Hrs. Annual | 4,398
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $57,017 | 1,142,553 |
kWh
|
$0.050 |
| Electricity Demand | $27,274 | 4,496 |
kW-mo/yr
|
$6.07 |
| Electricity Fees | $5,875 | - |
|
- |
| Natural Gas | $71,950 | 15,350 |
MMBtu
|
$4.69 |
| TOTAL YEARLY COSTS | $162,116 | |||
| RECOMMENDED SAVINGS* | $35,180 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $33,990 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $15,590 | $8,175 |
$10,220
212,900
kWh
|
$5,370
-
kW-mo/yr
|
- | |
| 02 | 2.1224: Replace boiler | $8,200 | $42,760 | - | - |
$8,200
-
MMBtu
|
|
| 03 | 2.3212: Optimize plant power factor | $6,400 | $12,960 | - |
$6,400
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $3,500 | $1,340 |
$2,320
48,400
kWh
|
$1,180
-
kW-mo/yr
|
- | |
| 05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $950 | - |
$950
19,800
kWh
|
- | - | |
| 06 | 2.7111: Reduce illumination to minimum necessary levels | $300 | $26 |
$200
4,100
kWh
|
$100
-
kW-mo/yr
|
- | |
| 07 | 2.4231: Reduce the pressure of compressed air to the minimum required | $240 | $350 |
$240
5,000
kWh
|
- | - | |
| TOTAL RECOMMENDED | $35,180 | $65,611 |
$13,930
290,200
kWh
|
$13,050
-
kW-mo/yr
|
$8,200
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $33,990 | $65,261 |
$12,740
265,400
kWh
|
$13,050
-
kW-mo/yr
|
$8,200
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs