Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

1,350

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Other motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
MS0342 #01 Y:2009 Utilize higher efficiency lamps and/or ballasts $35,269 $61,142
UD0799 #12 Y:2009 Utilize energy-efficient belts and other improved mechanisms $450 -
UD0799 #11 Y:2009 Utilize daylight whenever possible in lieu of artificial light $546 $551
UD0799 #10 Y:2009 Pay utility bills on time $1,095 -
UD0799 #09 Y:2009 Utilize higher efficiency lamps and/or ballasts $1,539 $4,298
UD0799 #08 Y:2009 Reduce the pressure of compressed air to the minimum required $1,628 $5,700
UD0799 #07 Y:2009 Make a practice of turning off lights when not needed $1,870 -
UD0799 #06 Y:2009 Install / repair insulation on steam lines $2,259 $1,152
UD0799 #05 Y:2009 Cover open tanks $4,422 $360
UD0799 #04 Y:2009 Repair and eliminate steam leaks $6,163 $2,000
UD0799 #03 Y:2009 Analyze flue gas for proper air/fuel ratio $6,189 $100
UD0799 #02 Y:2009 Use counter current rinsing to reduce waste water $6,223 $1,500
UD0799 #01 Y:2009 Utilize higher efficiency lamps and/or ballasts $9,795 $20,953
BD0360 #09 Y:2009 Insulate bare equipment $2,040 $740
BD0360 #08 Y:2009 Modify startup/shutdown times $31,490 $2,000
BD0360 #07 Y:2009 Utilize energy-efficient belts and other improved mechanisms $1,624 $2,500
BD0360 #06 Y:2009 Use most efficient type of electric motors $2,217 $4,200
BD0360 #05 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $25,740 $2,700
BD0360 #04 Y:2009 Reduce the pressure of compressed air to the minimum required $5,394 -
BD0360 #03 Y:2009 Install compressor air intakes in coolest locations $1,222 $1,000