218
matching recommendations
$
$
| ARC | 2+ Digits Required | |
| NAICS | Other motor vehicle parts manufacturing | |
| SIC | 2+ Digits Required | |
| 3+ Characters Required for Products | ||
| ID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
|---|---|---|---|---|---|---|
| UD1030 #08 Y:2021 | 08 | 2021 | Insulate bare equipment | $20,126 | $28,000 | |
| UD1030 #07 Y:2021 | 07 | 2021 | Utilize higher efficiency lamps and/or ballasts | $17,553 | $21,607 | |
| UD1030 #06 Y:2021 | 06 | 2021 | Size electric motors for peak operating efficiency | $5,833 | $4,000 | |
| UD1030 #05 Y:2021 | 05 | 2021 | Eliminate or reduce compressed air usage | $1,569 | $35 | |
| UD1030 #04 Y:2021 | 04 | 2021 | Eliminate leaks in inert gas and compressed air lines/ valves | $4,026 | $340 | |
| UD1030 #03 Y:2021 | 03 | 2021 | Eliminate or reduce compressed air usage | $11,468 | $4,319 | |
| UD1030 #02 Y:2021 | 02 | 2021 | Utilize energy-efficient belts and other improved mechanisms | $281 | - | |
| UD1030 #01 Y:2021 | 01 | 2021 | Turn off equipment during breaks, reduce operating time | $3,340 | - | |
| UD0973 #11 Y:2017 | 11 | 2017 | Utilize higher efficiency lamps and/or ballasts | $7,134 | $44,200 | |
| UD0973 #10 Y:2017 | 10 | 2017 | Use waste heat from hot flue gases to preheat | $2,232 | $10,000 | |
| UD0973 #09 Y:2017 | 09 | 2017 | Use most efficient type of electric motors | $2,323 | $3,821 | |
| UD0973 #08 Y:2017 | 08 | 2017 | Utilize energy-efficient belts and other improved mechanisms | $6,858 | - | |
| UD0973 #07 Y:2017 | 07 | 2017 | Install motor voltage controller on lightly loaded motors | $58,900 | $97,666 | |
| UD0973 #06 Y:2017 | 06 | 2017 | Remove or close off unneeded compressed air lines | $2,445 | - | |
| UD0973 #05 Y:2017 | 05 | 2017 | Eliminate or reduce compressed air usage | $18,317 | $40 | |
| UD0973 #04 Y:2017 | 04 | 2017 | Install compressor air intakes in coolest locations | $23,858 | $8,000 | |
| UD0973 #03 Y:2017 | 03 | 2017 | Eliminate leaks in inert gas and compressed air lines/ valves | $38,320 | $1,000 | |
| UD0973 #02 Y:2017 | 02 | 2017 | Eliminate or reduce compressed air usage | $73,029 | $100,000 | |
| UD0973 #01 Y:2017 | 01 | 2017 | Meter waste water | $6,762 | $1,000 | |
| UD0963 #13 Y:2016 | 13 | 2016 | Reduce illumination to minimum necessary levels | $402 | $630 |