ITAC Assessment: UD0963
ITAC logo
ITAC Assessment: UD0963
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Sunroofs
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 380
Plant Area 128,755
ft2
Annual Production 1,096,625
units
Production Hrs. Annual 5,000
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $263,110 3,556,000
kWh
Electricity Demand $42,159 8,448
kW-mo/yr
Electricity Fees $2,462 -
Natural Gas $91,718 16,682
MMBtu
Waste Disposal Costs
Water Usage $17,024 5,136
Tgal
Water Disposal $29,294 5,132
Tgal
TOTAL YEARLY COSTS $445,767
RECOMMENDED SAVINGS* $45,835 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $7,371

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7241: Install outside air damper / economizer on hvac unit $8,133 $4,500 $8,133
109,694
kWh
- - -
02 2.7224: Reduce space conditioning during non-working hours $4,232 $400 - - $4,232
-
MMBtu
-
03 2.7224: Reduce space conditioning during non-working hours $3,139 - $3,139
42,342
kWh
- - -
04 2.1123: Install automatic stack damper $1,358 $548 - - $1,358
-
MMBtu
-
05 2.4226: Use / purchase optimum sized compressor $8,870 $37,000 $8,168
110,160
kWh
$702
-
kW-mo/yr
- -
06 2.4235: Remove or close off unneeded compressed air lines $5,095 $4,624 $5,095
68,717
kWh
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,311 - $4,193
56,549
kWh
$278
-
kW-mo/yr
- $(-2,160.0)
08 2.4226: Use / purchase optimum sized compressor $648 - $481
6,486
kWh
$167
-
kW-mo/yr
- -
09 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,428 $3,701 $1,168
15,748
kWh
$260
-
kW-mo/yr
- -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,250 $3,655 $1,840
24,821
kWh
$410
-
kW-mo/yr
- -
11 2.7142: Utilize higher efficiency lamps and/or ballasts $5,727 $21,847 $4,982
67,200
kWh
$555
-
kW-mo/yr
- $190
12 2.7142: Utilize higher efficiency lamps and/or ballasts $2,242 $7,925 $1,774
23,929
kWh
$329
-
kW-mo/yr
- $139
13 2.7111: Reduce illumination to minimum necessary levels $402 $630 $362
4,885
kWh
$40
-
kW-mo/yr
- -
TOTAL RECOMMENDED $45,835 $84,830 $39,335
530,531
kWh
$2,741
-
kW-mo/yr
$5,590
-
MMBtu
$(-1,831.0)
TOTAL IMPLEMENTED $7,371 $400 $3,139
42,342
kWh
- $4,232
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings