matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
TT0329 #08 Y:2025 | 08 | 2025 | Use adjustable frequency drive or multiple speed motors on existing system | $566 | $600 |
n/a
|
TT0329 #07 Y:2025 | 07 | 2025 | Turn off equipment during breaks, reduce operating time | $1,666 | $2,490 |
n/a
|
TT0329 #06 Y:2025 | 06 | 2025 | Upgrade controls on compressors | $1,983 | $500 |
n/a
|
TT0329 #05 Y:2025 | 05 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,210 | $275 |
n/a
|
TT0329 #04 Y:2025 | 04 | 2025 | Utilize higher efficiency lamps and/or ballasts | $2,292 | $768 |
n/a
|
TT0329 #03 Y:2025 | 03 | 2025 | Turn off equipment when not in use | $6,117 | $120 |
n/a
|
TT0329 #02 Y:2025 | 02 | 2025 | Recover waste heat from equipment | $6,292 | $5,000 |
n/a
|
TT0329 #01 Y:2025 | 01 | 2025 | Use solar heat for heat | $77,572 | $478,110 |
n/a
|
CI0047 #11 Y:2025 | 11 | 2025 | Use photocell controls | $946 | $750 |
n/a
|
CI0047 #10 Y:2025 | 10 | 2025 | Adjust / maintain fork lift trucks for most efficient operation | $4,676 | $10,000 |
n/a
|
CI0047 #09 Y:2025 | 09 | 2025 | Eliminate or reduce compressed air usage | $4,809 | $25 |
n/a
|
CI0047 #08 Y:2025 | 08 | 2025 | Replace existing chiller with high efficiency model | $5,584 | $70,000 |
n/a
|
CI0047 #07 Y:2025 | 07 | 2025 | Use / purchase optimum sized compressor | $32,345 | $75,000 |
n/a
|
CI0047 #06 Y:2025 | 06 | 2025 | Store heated/ cooled water for use during peak demand periods | $44,384 | $135,900 |
n/a
|
CI0047 #05 Y:2025 | 05 | 2025 | Insulate glazing, walls, ceilings, and roofs | $46,098 | $132,687 |
n/a
|
CI0047 #04 Y:2025 | 04 | 2025 | Use battery storage for demand control | $68,217 | $808,402 |
n/a
|
CI0047 #03 Y:2025 | 03 | 2025 | Eliminate leaks in inert gas and compressed air lines/ valves | $89,970 | $5,500 |
n/a
|
CI0047 #02 Y:2025 | 02 | 2025 | Adopt in-house material generation | $185,000 | $300,000 |
n/a
|
CI0047 #01 Y:2025 | 01 | 2025 | Adopt in-house material generation | $216,823 | $1,200,000 |
n/a
|
TT0321 #13 Y:2024 | 13 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $584 | $1,125 |
n/a
|