ITAC Assessment: TT0329
ITAC logo
ITAC Assessment: TT0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Window regulators
NAICS 336370: Motor Vehicle Metal Stamping
SIC 3465: Automotive Stampings
Sales Range $100
M
to 500
M
# of Employees 227
Plant Area 150,000
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 5,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $207,800 2,443,555
kWh
Electricity Demand $94,162 6,973
kW-mo/yr
Electricity Fees $(-14,785.0) -
Natural Gas $18,910 2,172
MMBtu
Waste Disposal Costs
Water Usage $8,497 636
Tgal
Water Disposal $9,706 636
Tgal
TOTAL YEARLY COSTS $324,290
RECOMMENDED SAVINGS* $98,698 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9113: Use solar heat for heat $77,572 $478,110 $77,572
912,621
kWh
- -
02 2.2437: Recover waste heat from equipment $6,292 $5,000 - - $6,292
-
MMBtu
03 2.6218: Turn off equipment when not in use $6,117 $120 $6,117
71,973
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,292 $768 $1,659
19,520
kWh
$633
-
kW-mo/yr
-
05 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,210 $275 $2,210
26,002
kWh
- -
06 2.4224: Upgrade controls on compressors $1,983 $500 $1,983
23,333
kWh
- -
07 2.6212: Turn off equipment during breaks, reduce operating time $1,666 $2,490 $1,666
19,600
kWh
- -
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $566 $600 $345
4,064
kWh
$221
-
kW-mo/yr
-
TOTAL RECOMMENDED $98,698 $487,863 $91,552
1,077,113
kWh
$854
-
kW-mo/yr
$6,292
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs