361
matching recommendationsID | # | Year | Description | Yearly Savings |
Implementation
Imp Cost |
Status |
---|---|---|---|---|---|---|
MU0045 #14 Y:2024 | 14 | 2024 | Pay bills on time to avoid late fees | $4,768 | - |
n/a
|
MU0045 #13 Y:2024 | 13 | 2024 | Minimize water usage | $60,609 | $146,420 |
n/a
|
MU0045 #12 Y:2024 | 12 | 2024 | Minimize water usage | $25,914 | $8,239 |
n/a
|
MU0045 #11 Y:2024 | 11 | 2024 | Install partitions to reduce size of conditioned space | $1,256 | $1,302 |
n/a
|
MU0045 #10 Y:2024 | 10 | 2024 | Use proper thickness of insulation on building envelope | $5,014 | $4,165 |
n/a
|
MU0045 #09 Y:2024 | 09 | 2024 | Install vinyl strip / high speed / air curtain doors | $38,860 | $12,105 |
n/a
|
MU0045 #08 Y:2024 | 08 | 2024 | Lower temperature during the winter season and vice-versa | $2,871 | - |
n/a
|
MU0045 #07 Y:2024 | 07 | 2024 | Utilize higher efficiency lamps and/or ballasts | $1,694 | $706 |
n/a
|
MU0045 #06 Y:2024 | 06 | 2024 | Turn off equipment when not in use | $5,088 | - |
n/a
|
MU0045 #05 Y:2024 | 05 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $2,606 | $17 |
n/a
|
MU0045 #04 Y:2024 | 04 | 2024 | Use or replace with energy efficient substitutes | $7,936 | $18,703 |
n/a
|
MU0045 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $31,005 | $34,270 |
n/a
|
MU0045 #02 Y:2024 | 02 | 2024 | Optimize plant power factor | $14,981 | $56,840 |
n/a
|
MU0045 #01 Y:2024 | 01 | 2024 | Recharge batteries on during off-peak demand periods | $1,629 | - |
n/a
|
GT0977 #05 Y:2024 | 05 | 2024 | Use solar heat to make electricty | $72,598 | $1,299,381 |
n/a
|
GT0977 #04 Y:2024 | 04 | 2024 | Turn off equipment during breaks, reduce operating time | $6,327 | $12,892 |
n/a
|
GT0977 #03 Y:2024 | 03 | 2024 | Use adjustable frequency drive or multiple speed motors on existing system | $15,128 | $14,000 |
n/a
|
GT0977 #02 Y:2024 | 02 | 2024 | Turn off equipment when not in use | $1,957 | $1,500 |
n/a
|
GT0977 #01 Y:2024 | 01 | 2024 | Eliminate leaks in inert gas and compressed air lines/ valves | $85,518 | $1,850 |
n/a
|
UD1083 #09 Y:2024 | 09 | 2024 | Install occupancy sensors | $2,220 | $1,846 |
n/a
|