ITAC Assessment: TT0323
ITAC logo
ITAC Assessment: TT0323
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Axels and Driveshafts
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 140,000
ft2
Annual Production 75,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $327,578 4,211,000
kWh
Electricity Demand $140,390 9,423
kW-mo/yr
Natural Gas $21,210 2,737
MMBtu
LPG $62,029 2,567
MMBtu
Waste Disposal Costs
Water Usage $28,839 4,276
Tgal
Water Disposal $63,499 4,276
Tgal
TOTAL YEARLY COSTS $643,545
RECOMMENDED SAVINGS* $79,864 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6218: Turn off equipment when not in use $451 - $50
645
kWh
$400
-
kW-mo/yr
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,234 $2,520 $8,234
105,978
kWh
- -
03 2.6231: Utilize controls to operate equipment only when needed $1,028 $400 $1,028
13,210
kWh
- -
04 2.4239: Eliminate or reduce compressed air usage $315 $180 $315
4,045
kWh
- -
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,604 $2,430 $2,604
33,480
kWh
- -
06 4.422: Utilize outside contracting $27,937 $30,000 $26,211
336,880
kWh
- $1,725
-
MMBtu
07 2.7229: Air condition only space necessary $12,931 $18,000 $5,904
75,900
kWh
- $7,027
-
MMBtu
08 2.9113: Use solar heat for heat $26,365 $221,500 $26,365
338,921
kWh
- -
TOTAL RECOMMENDED $79,864 $275,030 $70,711
909,059
kWh
$400
-
kW-mo/yr
$8,752
-
MMBtu
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs