Assessment Year | 2025 |
---|---|
Principal Product | Axels and Driveshafts |
NAICS | 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $10 M to 50M |
# of Employees | 215 |
Plant Area |
140,000
ft2
|
Annual Production | 75,000
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $327,578 | 4,211,000 |
kWh
|
$0.078 | |
Electricity Demand | $140,390 | 9,423 |
kW-mo/yr
|
$14.90 | |
Natural Gas | $21,210 | 2,737 |
MMBtu
|
$7.75 | |
LPG | $62,029 | 2,567 |
MMBtu
|
$24.17 | |
Waste Disposal Costs | |||||
Water Usage | $28,839 | 4,276 |
Tgal
|
$6.74 | |
Water Disposal | $63,499 | 4,276 |
Tgal
|
$14.85 | |
TOTAL YEARLY COSTS | $643,545 | ||||
RECOMMENDED SAVINGS* | $79,864 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.6218: Turn off equipment when not in use | $451 | - |
$50
645
kWh
|
$400
-
kW-mo/yr
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $8,234 | $2,520 |
$8,234
105,978
kWh
|
- | - | |
03 | 2.6231: Utilize controls to operate equipment only when needed | $1,028 | $400 |
$1,028
13,210
kWh
|
- | - | |
04 | 2.4239: Eliminate or reduce compressed air usage | $315 | $180 |
$315
4,045
kWh
|
- | - | |
05 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $2,604 | $2,430 |
$2,604
33,480
kWh
|
- | - | |
06 | 4.422: Utilize outside contracting | $27,937 | $30,000 |
$26,211
336,880
kWh
|
- |
$1,725
-
MMBtu
|
|
07 | 2.7229: Air condition only space necessary | $12,931 | $18,000 |
$5,904
75,900
kWh
|
- |
$7,027
-
MMBtu
|
|
08 | 2.9113: Use solar heat for heat | $26,365 | $221,500 |
$26,365
338,921
kWh
|
- | - | |
TOTAL RECOMMENDED | $79,864 | $275,030 |
$70,711
909,059
kWh
|
$400
-
kW-mo/yr
|
$8,752
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs