Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

221

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle brake system manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
NC0661 #03 Y:2021 Eliminate or reduce compressed air usage $1,376 $4,000
NC0661 #02 Y:2021 Recover waste heat from equipment $6,073 $27,600
NC0661 #01 Y:2021 Utilize higher efficiency lamps and/or ballasts $1,982 $3,360
TT0223 #10 Y:2019 Recover waste heat from equipment $159 $200
TT0223 #09 Y:2019 Optimize plant power factor $657 $1,500
TT0223 #08 Y:2019 Use adjustable frequency drive or multiple speed motors on existing system $1,166 $1,000
TT0223 #07 Y:2019 Apply for investment incentives $4,144 $40
TT0223 #06 Y:2019 Meter recycled water (to reduce sewer charges) $4,372 $3,900
TT0223 #05 Y:2019 Utilize energy-efficient belts and other improved mechanisms $6,556 $7,425
TT0223 #04 Y:2019 Reduce the pressure of compressed air to the minimum required $7,403 $80
TT0223 #03 Y:2019 Size electric motors for peak operating efficiency $23,500 $2,000
TT0223 #02 Y:2019 Utilize higher efficiency lamps and/or ballasts $36,339 $172,868
TT0223 #01 Y:2019 Recover waste heat from equipment $60,944 $189,000
UD0996 #12 Y:2019 Utilize higher efficiency lamps and/or ballasts $27,848 $80,000
UD0996 #11 Y:2019 Use or replace with energy efficient substitutes $28,290 $5,250
UD0996 #10 Y:2019 Recycle air for heating, ventilation and air conditioning $37,159 $98,800
UD0996 #09 Y:2019 Use "heat wheel" or other heat exchanger to cross-exchange building exhaust air with make-up air $48,531 $11,000
UD0996 #08 Y:2019 Optimize plant power factor $127,402 $60,000
UD0996 #07 Y:2019 Replace existing chiller with high efficiency model $18,128 $3,500
UD0996 #06 Y:2019 Cover open tanks $8,047 $1,400