ITAC Assessment: TT0223
ITAC logo
ITAC Assessment: TT0223
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2019
Principal Product Brake Pads
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $10
M
to 50
M
# of Employees 470
Plant Area 312,000
ft2
Annual Production 1,800,000
pieces
Production Hrs. Annual 7,200
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $1,135,219 37,531,395
kWh
Electricity Demand $780,823 66,216
kW-mo/yr
Natural Gas $352,869 86,214
MMBtu
Waste Disposal Costs
Water Usage $51,673 6,505
Tgal
Water Disposal $43,995 6,505
Tgal
TOTAL YEARLY COSTS $2,364,579
RECOMMENDED SAVINGS* $145,240 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,339

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.2437: Recover waste heat from equipment $60,944 $189,000 $(-477.0)
(-15,798)
kWh
$(-310.0)
-
kW-mo/yr
$61,731
-
MMBtu
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $36,339 $172,868 $24,991
827,516
kWh
$11,348
-
kW-mo/yr
- - -
03 2.4131: Size electric motors for peak operating efficiency $23,500 $2,000 $15,297
506,539
kWh
$8,203
-
kW-mo/yr
- - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $7,403 $80 $7,403
245,147
kWh
- - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $6,556 $7,425 $4,038
133,714
kWh
$2,518
-
kW-mo/yr
- - -
06 3.4116: Meter recycled water (to reduce sewer charges) $4,372 $3,900 - - - $4,372
-
Tgal
-
07 4.812: Apply for investment incentives $4,144 $40 - - - - $4,144
08 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,166 $1,000 $760
25,152
kWh
$406
-
kW-mo/yr
- - -
09 2.3212: Optimize plant power factor $657 $1,500 $657
21,753
kWh
- - - -
10 2.2437: Recover waste heat from equipment $159 $200 - - $159
-
MMBtu
- -
TOTAL RECOMMENDED $145,240 $378,013 $52,669
1,744,023
kWh
$22,165
-
kW-mo/yr
$61,890
-
MMBtu
$4,372
-
Tgal
$4,144
TOTAL IMPLEMENTED $36,339 $172,868 $24,991
827,516
kWh
$11,348
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings