ITAC Assessment: SD0166
ITAC logo
ITAC Assessment: SD0166
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Ball Point Pens and Refills
NAICS
n/a
SIC 3951: Pens, Mechanical Pencils, and Parts
Sales Range $50
M
to 100
M
# of Employees 150
Plant Area 240,000
ft2
Annual Production 84,000,000
pieces
Production Hrs. Annual 2,120
hrs
Location (State) California

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $176,035 3,089,684
kWh
Electricity Demand $81,617 10,992
kW-mo/yr
Natural Gas $3,062 457
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $416,850 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,159

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $2,538 $4,410 $1,585
27,843
kWh
$953
-
kW-mo/yr
- -
02 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,386 $2,800 $1,028
18,171
kWh
$1,358
-
kW-mo/yr
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,063 $600 $717
6,448
kWh
$346
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,470 $6,916 $1,502
26,377
kWh
$968
-
kW-mo/yr
- -
05 2.7144: Install spectral reflectors / delamp $3,641 $4,770 $2,206
38,687
kWh
$1,435
-
kW-mo/yr
- -
06 2.7135: Install occupancy sensors $2,061 $943 $1,224
21,395
kWh
$837
-
kW-mo/yr
- -
07 3.7197: Use ultrasonic cleaning $31,800 $2,000 - - $31,800
-
gal
-
08 3.5112: Reprocess spent oils on site for re-use $491 - - - $491
-
gal
-
09 4.521: Clear and rent existing space $370,400 $53,750 - - - $370,400
TOTAL RECOMMENDED $416,850 $76,189 $8,262
138,921
kWh
$5,897
-
kW-mo/yr
$32,291
-
gal
$370,400
TOTAL IMPLEMENTED $14,159 $20,439 $8,262
138,921
kWh
$5,897
-
kW-mo/yr
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Other Liquid (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs