ITAC Assessment: TT0196
ITAC logo
ITAC Assessment: TT0196
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2017
Principal Product Hydro-static Transmissions and Rear Differentials
NAICS 336350: Motor Vehicle Transmission and Power Train Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 190
Plant Area 215,000
ft2
Annual Production 900,000
units
Production Hrs. Annual 6,912
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $528,167 8,485,470
kWh
Electricity Demand $240,603 19,822
kW-mo/yr
Natural Gas $19,532 3,065
MMBtu
TOTAL YEARLY COSTS $788,302
RECOMMENDED SAVINGS* $68,984 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,605

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.9113: Use solar heat for heat $36,417 $148,815 $36,417
548,000
kWh
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $19,605 $3,050 $19,605
315,187
kWh
-
03 2.3212: Optimize plant power factor $5,438 $19,250 - $5,438
-
kW-mo/yr
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,985 $31 $3,724
59,817
kWh
$1,261
-
kW-mo/yr
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $2,539 $1,150 $2,539
40,825
kWh
-
TOTAL RECOMMENDED $68,984 $172,296 $62,285
963,829
kWh
$6,699
-
kW-mo/yr
TOTAL IMPLEMENTED $19,605 $3,050 $19,605
315,187
kWh
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs