Assessment Year | 2021 |
---|---|
Principal Product | Friction disks |
NAICS | 336340: Motor Vehicle Brake System Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $50 M to 100M |
# of Employees | 137 |
Plant Area |
240,000
ft2
|
Annual Production | 3,000,000
pieces
|
Production Hrs. Annual | 8,760
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $745,403 | 15,718,380 |
kWh
|
$0.047 | |
Electricity Demand | $601,487 | 45,666 |
kW-mo/yr
|
$13.17 | |
Electricity Fees | $(-84,704.0) | - |
|
- | |
Natural Gas | $36,225 | 4,931 |
MMBtu
|
$7.35 | |
Waste Disposal Costs | |||||
Water Usage | $3,747 | 1,498 |
Tgal
|
$2.50 | |
Water Disposal | $3,747 | 1,498 |
Tgal
|
$2.50 | |
TOTAL YEARLY COSTS | $1,305,905 | ||||
RECOMMENDED SAVINGS* | $11,589 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,982 | $3,360 |
$1,274
26,880
kWh
|
$708
-
kW-mo/yr
|
- | - | |
02 | 2.2437: Recover waste heat from equipment | $6,073 | $27,600 | - | - |
$6,073
-
MMBtu
|
- | |
03 | 2.4239: Eliminate or reduce compressed air usage | $1,376 | $4,000 |
$997
21,024
kWh
|
$379
-
kW-mo/yr
|
- | - | |
04 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,158 | $2,300 | - | - | - |
$2,158
-
Tgal
|
|
TOTAL RECOMMENDED | $11,589 | $37,260 |
$2,271
47,904
kWh
|
$1,087
-
kW-mo/yr
|
$6,073
-
MMBtu
|
$2,158
-
Tgal
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | - |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs