ITAC Assessment: NC0661
ITAC logo
ITAC Assessment: NC0661
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2021
Principal Product Friction disks
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $50
M
to 100
M
# of Employees 137
Plant Area 240,000
ft2
Annual Production 3,000,000
pieces
Production Hrs. Annual 8,760
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $745,403 15,718,380
kWh
Electricity Demand $601,487 45,666
kW-mo/yr
Electricity Fees $(-84,704.0) -
Natural Gas $36,225 4,931
MMBtu
Waste Disposal Costs
Water Usage $3,747 1,498
Tgal
Water Disposal $3,747 1,498
Tgal
TOTAL YEARLY COSTS $1,305,905
RECOMMENDED SAVINGS* $11,589 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,982 $3,360 $1,274
26,880
kWh
$708
-
kW-mo/yr
- -
02 2.2437: Recover waste heat from equipment $6,073 $27,600 - - $6,073
-
MMBtu
-
03 2.4239: Eliminate or reduce compressed air usage $1,376 $4,000 $997
21,024
kWh
$379
-
kW-mo/yr
- -
04 3.4116: Meter recycled water (to reduce sewer charges) $2,158 $2,300 - - - $2,158
-
Tgal
TOTAL RECOMMENDED $11,589 $37,260 $2,271
47,904
kWh
$1,087
-
kW-mo/yr
$6,073
-
MMBtu
$2,158
-
Tgal
TOTAL IMPLEMENTED - - - - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs