ITAC Assessment: BD0314
ITAC logo
ITAC Assessment: BD0314
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product Shade Structures
NAICS 332311: Prefabricated Metal Building and Component Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $5
M
to 10
M
# of Employees 68
Plant Area 133,000
ft2
Annual Production 80,000
pieces
Production Hrs. Annual 3,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,485 1,769,700
kWh
Electricity Demand $55,152 9,192
kW-mo/yr
Natural Gas $46,962 52,991
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $25,579 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $491

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.6242: Minimize operation of equipment maintained in standby condition $9,543 - $9,543
190,857
kWh
- -
02 2.4314: Use synthetic lubricant $1,020 $1,500 $698
13,965
kWh
$322
-
kW-mo/yr
-
03 2.4221: Install compressor air intakes in coolest locations $491 $1,250 $336
6,726
kWh
$155
-
kW-mo/yr
-
04 2.7231: Use radiant heater for spot heating $7,677 $9,600 - - $7,677
-
MMBtu
05 2.1221: Replace obsolete burners with more efficient ones $1,824 $1,200 - - $1,824
-
MMBtu
06 2.7142: Utilize higher efficiency lamps and/or ballasts $3,382 $4,955 $2,094
41,897
kWh
$1,288
-
kW-mo/yr
-
07 2.7135: Install occupancy sensors $1,221 $525 $791
15,818
kWh
$430
-
kW-mo/yr
-
08 2.4133: Use most efficient type of electric motors $421 $1,230 $238
4,756
kWh
$183
-
kW-mo/yr
-
TOTAL RECOMMENDED $25,579 $20,260 $13,700
274,019
kWh
$2,378
-
kW-mo/yr
$9,501
-
MMBtu
TOTAL IMPLEMENTED $491 $1,250 $336
6,726
kWh
$155
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs