Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

51

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle steering and suspension components (except spring) manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UL2309 #07 Y:2023 Improve air circulation with destratification fans / other methods $8,813 $15,000
UL2309 #06 Y:2023 Lower temperature during the winter season and vice-versa $2,607 $1,000
UL2309 #05 Y:2023 Use solar heat to make electricty $194,066 $1,198,885
UL2309 #04 Y:2023 Eliminate leaks in inert gas and compressed air lines/ valves $21,370 $18,360
UL2309 #03 Y:2023 Reduce the pressure of compressed air to the minimum required $12,637 -
UL2309 #02 Y:2023 Install occupancy sensors $957 $1,596
UL2309 #01 Y:2023 Utilize higher efficiency lamps and/or ballasts $10,305 $2,688
UL2305 #08 Y:2023 Lower temperature during the winter season and vice-versa $1,779 -
UL2305 #07 Y:2023 Use proper thickness of insulation on building envelope $29,120 $60,633
UL2305 #06 Y:2023 Use adjustable frequency drive or multiple speed motors on existing system $8,763 $9,750
UL2305 #05 Y:2023 Reduce the pressure of compressed air to the minimum required $2,738 -
UL2305 #04 Y:2023 Reduce illumination to minimum necessary levels $2,439 -
UL2305 #03 Y:2023 Utilize higher efficiency lamps and/or ballasts $1,322 $500
UL2305 #02 Y:2023 Use solar heat to make electricty $25,542 $325,397
UL2305 #01 Y:2023 Optimize plant power factor $3,238 $9,672
UL2208 #05 Y:2022 Use solar heat to make electricty $58,141 $745,985
UL2208 #04 Y:2022 Change rate schedules or other changes in utility service $29,853 -
UL2208 #03 Y:2022 Reduce the pressure of compressed air to the minimum required $35,045 -
UL2208 #02 Y:2022 Install occupancy sensors $1,464 $422
UL2208 #01 Y:2022 Utilize higher efficiency lamps and/or ballasts $12,079 $9,418