Assessment Year | 2023 |
---|---|
Principal Product | Automotive Steering Components |
NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $100 M to 500M |
# of Employees | 360 |
Plant Area |
498,448
ft2
|
Annual Production | 224,008
pieces
|
Production Hrs. Annual | 7,560
hrs
|
Location (State) | Kentucky |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $170,361 | 3,244,570 |
kWh
|
$0.053 | |
Electricity Demand | $57,673 | 6,573 |
kW-mo/yr
|
$8.77 | |
Electricity Fees | $121,754 | - |
|
- | |
Natural Gas | $24,396 | 2,164 |
MMBtu
|
$11.27 | |
Waste Disposal Costs | |||||
Water Usage | $4,968 | 735 |
Tgal
|
$6.76 | |
Water Disposal | $4,994 | 735 |
Tgal
|
$6.79 | |
TOTAL YEARLY COSTS | $384,146 | ||||
RECOMMENDED SAVINGS* | $74,941 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $5,839 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.3212: Optimize plant power factor | $3,238 | $9,672 | - | - | $3,238 | - | |
02 | 2.9114: Use solar heat to make electricty | $25,542 | $325,397 |
$18,135
345,401
kWh
|
$7,407
-
kW-mo/yr
|
- | - | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,322 | $500 |
$1,059
19,991
kWh
|
$263
-
kW-mo/yr
|
- | - | |
04 | 2.7111: Reduce illumination to minimum necessary levels | $2,439 | - |
$1,950
38,022
kWh
|
$489
-
kW-mo/yr
|
- | - | |
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,738 | - |
$2,738
50,894
kWh
|
- | - | - | |
06 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $8,763 | $9,750 |
$8,763
165,330
kWh
|
- | - | - | |
07 | 2.7492: Use proper thickness of insulation on building envelope | $29,120 | $60,633 |
$13,146
248,039
kWh
|
- | - |
$15,974
-
MMBtu
|
|
08 | 2.7221: Lower temperature during the winter season and vice-versa | $1,779 | - |
$803
15,148
kWh
|
- | - |
$976
-
MMBtu
|
|
TOTAL RECOMMENDED | $74,941 | $405,952 |
$46,594
882,825
kWh
|
$8,159
-
kW-mo/yr
|
$3,238 |
$16,950
-
MMBtu
|
||
TOTAL IMPLEMENTED | $5,839 | $500 |
$4,600
86,033
kWh
|
$263
-
kW-mo/yr
|
- |
$976
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs