ITAC Assessment: UL2305
ITAC logo
ITAC Assessment: UL2305
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2023
Principal Product Automotive Steering Components
NAICS 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $100
M
to 500
M
# of Employees 360
Plant Area 498,448
ft2
Annual Production 224,008
pieces
Production Hrs. Annual 7,560
hrs
Location (State) Kentucky

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $170,361 3,244,570
kWh
Electricity Demand $57,673 6,573
kW-mo/yr
Electricity Fees $121,754 -
Natural Gas $24,396 2,164
MMBtu
Waste Disposal Costs
Water Usage $4,968 735
Tgal
Water Disposal $4,994 735
Tgal
TOTAL YEARLY COSTS $384,146
RECOMMENDED SAVINGS* $74,941 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,839

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.3212: Optimize plant power factor $3,238 $9,672 - - $3,238 -
02 2.9114: Use solar heat to make electricty $25,542 $325,397 $18,135
345,401
kWh
$7,407
-
kW-mo/yr
- -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $1,322 $500 $1,059
19,991
kWh
$263
-
kW-mo/yr
- -
04 2.7111: Reduce illumination to minimum necessary levels $2,439 - $1,950
38,022
kWh
$489
-
kW-mo/yr
- -
05 2.4231: Reduce the pressure of compressed air to the minimum required $2,738 - $2,738
50,894
kWh
- - -
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $8,763 $9,750 $8,763
165,330
kWh
- - -
07 2.7492: Use proper thickness of insulation on building envelope $29,120 $60,633 $13,146
248,039
kWh
- - $15,974
-
MMBtu
08 2.7221: Lower temperature during the winter season and vice-versa $1,779 - $803
15,148
kWh
- - $976
-
MMBtu
TOTAL RECOMMENDED $74,941 $405,952 $46,594
882,825
kWh
$8,159
-
kW-mo/yr
$3,238 $16,950
-
MMBtu
TOTAL IMPLEMENTED $5,839 $500 $4,600
86,033
kWh
$263
-
kW-mo/yr
- $976
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs