| Assessment Year | 2023 |
|---|---|
| Principal Product | Steering Columns |
| NAICS | 336330: Motor Vehicle Steering and Suspension Components (except Spring) Manufacturing |
| SIC | 3714: Motor Vehicle Parts and Accessories |
| Sales Range | $5 M to 10M |
| # of Employees | 500 |
| Plant Area |
644,000
ft2
|
| Annual Production | 2,500,000
pieces
|
| Production Hrs. Annual | 7,140
hrs
|
| Location (State) | Kentucky |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $456,811 | 2,998,116 |
kWh
|
$0.15 |
| Electricity Demand | $266,112 | 18,450 |
kW-mo/yr
|
$14.42 |
| Electricity Fees | $392,153 | - |
|
- |
| Natural Gas | $28,268 | 2,336 |
MMBtu
|
$12.10 |
| TOTAL YEARLY COSTS | $1,143,344 | |||
| RECOMMENDED SAVINGS* | $250,755 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $45,269 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $10,305 | $2,688 |
$8,633
56,794
kWh
|
$1,672
-
kW-mo/yr
|
- | |
| 02 | 2.7135: Install occupancy sensors | $957 | $1,596 |
$957
6,297
kWh
|
- | - | |
| 03 | 2.4231: Reduce the pressure of compressed air to the minimum required | $12,637 | - |
$9,245
60,825
kWh
|
$3,392
-
kW-mo/yr
|
- | |
| 04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $21,370 | $18,360 |
$21,370
140,596
kWh
|
- | - | |
| 05 | 2.9114: Use solar heat to make electricty | $194,066 | $1,198,885 |
$162,018
1,063,349
kWh
|
$32,048
-
kW-mo/yr
|
- | |
| 06 | 2.7221: Lower temperature during the winter season and vice-versa | $2,607 | $1,000 |
$2,170
14,255
kWh
|
- |
$437
-
MMBtu
|
|
| 07 | 2.7243: Improve air circulation with destratification fans / other methods | $8,813 | $15,000 |
$8,813
57,844
kWh
|
- | - | |
| TOTAL RECOMMENDED | $250,755 | $1,237,529 |
$213,206
1,399,960
kWh
|
$37,112
-
kW-mo/yr
|
$437
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $45,269 | $22,644 |
$40,205
264,512
kWh
|
$5,064
-
kW-mo/yr
|
- | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs