Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

256

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle electrical and electronic equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0359 #03 Y:2013 Install occupancy sensors $1,346 $470
SU0359 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $5,651 $1,900
SU0359 #01 Y:2013 Insulate feedwater tank $1,037 $137
IA0508 #10 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $8,022 $210
IA0508 #09 Y:2013 Install / repair insulation on steam lines $3,758 $976
IA0508 #08 Y:2013 Analyze flue gas for proper air/fuel ratio $3,512 $1,000
IA0508 #07 Y:2013 Utilize higher efficiency lamps and/or ballasts $598 $394
IA0508 #06 Y:2013 Install occupancy sensors $6,734 $5,775
IA0508 #05 Y:2013 Utilize controls to operate equipment only when needed $689 $1,590
IA0508 #04 Y:2013 Optimize plant power factor $6,113 $6,000
IA0508 #03 Y:2013 Direct warmest air to combustion intake $2,845 $1,000
IA0508 #02 Y:2013 Repair or replace steam traps $14,349 $3,750
IA0508 #01 Y:2013 Recycle air for heating, ventilation and air conditioning $218,077 $1,045,200
WV0474 #10 Y:2013 Analyze flue gas for proper air/fuel ratio $407 $500
WV0474 #09 Y:2013 Eliminate or reduce compressed air usage $701 $960
WV0474 #08 Y:2013 Utilize higher efficiency lamps and/or ballasts $967 $6,150
WV0474 #07 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $1,586 $324
WV0474 #06 Y:2013 Develop a repair/replace policy $1,715 $392
WV0474 #05 Y:2013 Chill water to the highest temperature possible $2,920 $72
WV0474 #04 Y:2013 Utilize energy-efficient belts and other improved mechanisms $3,360 -