ITAC Assessment: SU0359
ITAC logo
ITAC Assessment: SU0359
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2014
Principal Product Alternator and enginer starter parts
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $50
M
to 100
M
# of Employees 390
Plant Area 331,000
ft2
Annual Production 348,419
pieces
Production Hrs. Annual 5,902
hrs
Location (State) New York

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $164,944 8,331,500
kWh
Electricity Demand $65,404 14,697
kW-mo/yr
Electricity Fees $8,168 -
Natural Gas $427,050 86,401
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $89,417 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $10,441

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.2123: Insulate feedwater tank $1,037 $137 - - $1,037
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,651 $1,900 $5,651
282,564
kWh
- - -
03 2.7135: Install occupancy sensors $1,346 $470 $1,346
67,283
kWh
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $931 $855 $158
7,884
kWh
$49
-
kW-mo/yr
- $724
05 2.2414: Use waste heat from hot flue gases to preheat $78,976 $119,000 - - $78,976
-
MMBtu
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,476 $4,124 $1,476
73,775
kWh
- - -
TOTAL RECOMMENDED $89,417 $126,486 $8,631
431,506
kWh
$49
-
kW-mo/yr
$80,013
-
MMBtu
$724
TOTAL IMPLEMENTED $10,441 $7,486 $8,631
431,506
kWh
$49
-
kW-mo/yr
$1,037
-
MMBtu
$724
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs