ITAC Assessment: IA0508
ITAC logo
ITAC Assessment: IA0508
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product automotive spark plugs
NAICS 336320: Motor Vehicle Electrical and Electronic Equipment Manufacturing
SIC 3694: Electrical Equipment for Internal Combustion Engines
Sales Range $50
M
to 100
M
# of Employees 430
Plant Area 184,000
ft2
Annual Production 92,400,000
pieces
Production Hrs. Annual 8,560
hrs
Location (State) Iowa

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $637,605 18,544,050
kWh
Electricity Demand $310,417 32,831
kW-mo/yr
Electricity Fees $192,360 -
Natural Gas $446,146 76,100
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $264,697 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $31,266

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
01 2.7313: Recycle air for heating, ventilation and air conditioning $218,077 $1,045,200 - - - $218,077
-
MMBtu
02 2.2113: Repair or replace steam traps $14,349 $3,750 - - - $14,349
-
MMBtu
03 2.1213: Direct warmest air to combustion intake $2,845 $1,000 - - - $2,845
-
MMBtu
04 2.3212: Optimize plant power factor $6,113 $6,000 - - $6,113 -
05 2.6231: Utilize controls to operate equipment only when needed $689 $1,590 $689
20,080
kWh
- - -
06 2.7135: Install occupancy sensors $6,734 $5,775 $6,734
196,327
kWh
- - -
07 2.7142: Utilize higher efficiency lamps and/or ballasts $598 $394 $386
11,268
kWh
$212
-
kW-mo/yr
- -
08 2.1233: Analyze flue gas for proper air/fuel ratio $3,512 $1,000 - - - $3,512
-
MMBtu
09 2.2136: Install / repair insulation on steam lines $3,758 $976 - - - $3,758
-
MMBtu
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,022 $210 $4,516
131,689
kWh
$3,506
-
kW-mo/yr
- -
TOTAL RECOMMENDED $264,697 $1,065,895 $12,325
359,364
kWh
$3,718
-
kW-mo/yr
$6,113 $242,541
-
MMBtu
TOTAL IMPLEMENTED $31,266 $14,316 $689
20,080
kWh
- $6,113 $24,464
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs