Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

21

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle electrical and electronic equipment manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
SU0521 #07 Y:2022 Use adjustable frequency drive or multiple speed motors on existing system $1,254 $800
SU0521 #06 Y:2022 Utilize higher efficiency lamps and/or ballasts $99 $47
SU0521 #05 Y:2022 Eliminate leaks in inert gas and compressed air lines/ valves $2,226 $380
SU0521 #04 Y:2022 Eliminate or reduce compressed air usage $6,111 -
SU0521 #03 Y:2022 Apply for tax-free status for energy purchases $40 -
SU0521 #02 Y:2022 Apply for tax-free status for energy purchases $2,565 -
SU0521 #01 Y:2022 Reschedule plant operations or reduce load to avoid peaks $2,147 -
SU0359 #06 Y:2013 Use adjustable frequency drive or multiple speed motors on existing system $1,476 $4,124
SU0359 #05 Y:2013 Use waste heat from hot flue gases to preheat $78,976 $119,000
SU0359 #04 Y:2013 Utilize higher efficiency lamps and/or ballasts $931 $855
SU0359 #03 Y:2013 Install occupancy sensors $1,346 $470
SU0359 #02 Y:2013 Eliminate leaks in inert gas and compressed air lines/ valves $5,651 $1,900
SU0359 #01 Y:2013 Insulate feedwater tank $1,037 $137
SU0289 #08 Y:2009 Utilize higher efficiency lamps and/or ballasts $3,267 $8,373
SU0289 #07 Y:2009 Conserve energy by efficient use of vending machines $528 $714
SU0289 #06 Y:2009 Install occupancy sensors $1,653 $1,236
SU0289 #05 Y:2009 Recover waste heat from equipment $3,787 $964
SU0289 #04 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $7,383 $578
SU0289 #03 Y:2009 Pay bills on time to avoid late fees $1,552 -
SU0289 #02 Y:2009 Reduce the pressure of compressed air to the minimum required $3,573 -