Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

3,651

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle parts manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0042 #10 Y:2009 Use photocell controls $7,358 $502
UA0042 #09 Y:2009 Utilize higher efficiency lamps and/or ballasts $108,339 $300,727
UA0042 #08 Y:2009 Utilize higher efficiency lamps and/or ballasts $21,529 $39,184
UA0042 #07 Y:2009 Use optimum size and capacity equipment $1,124 $8,640
UA0042 #06 Y:2009 Utilize controls to operate equipment only when needed $5,258 $1,230
UA0042 #05 Y:2009 Turn off equipment when not in use $19,160 -
UA0042 #04 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $16,865 $5,500
UA0042 #03 Y:2009 Reduce the pressure of compressed air to the minimum required $2,894 -
UA0042 #02 Y:2009 Air condition only space necessary $27,615 $76,409
UA0042 #01 Y:2009 Recycle air for heating, ventilation and air conditioning $107,000 -
SU0289 #08 Y:2009 Utilize higher efficiency lamps and/or ballasts $3,267 $8,373
SU0289 #07 Y:2009 Conserve energy by efficient use of vending machines $528 $714
SU0289 #06 Y:2009 Install occupancy sensors $1,653 $1,236
SU0289 #05 Y:2009 Recover waste heat from equipment $3,787 $964
SU0289 #04 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $7,383 $578
SU0289 #03 Y:2009 Pay bills on time to avoid late fees $1,552 -
SU0289 #02 Y:2009 Reduce the pressure of compressed air to the minimum required $3,573 -
SU0289 #01 Y:2009 Utilize controls to operate equipment only when needed $13,013 -
BD0367 #14 Y:2009 Minimize water usage $1,884 $3,920
BD0367 #13 Y:2009 Use most efficient type of electric motors $27,993 $39,800