Assessment Year | 2009 |
---|---|
Principal Product | Brake Systems |
NAICS | 336340: Motor Vehicle Brake System Manufacturing |
SIC | 3714: Motor Vehicle Parts and Accessories |
Sales Range | $5 M to 10M |
# of Employees | 205 |
Plant Area |
100,970
ft2
|
Annual Production | 2,500,000
pieces
|
Production Hrs. Annual | 5,500
hrs
|
Location (State) | Georgia |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $441,291 | 9,273,322 |
kWh
|
$0.048 |
Electricity Demand | $165,048 | 22,829 |
kW-mo/yr
|
$7.23 |
Electricity Fees | $24,803 | - |
|
- |
Natural Gas | $152,574 | 15,474 |
MMBtu
|
$9.86 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $75,372 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,804 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings |
---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $27,075 | $19,000 |
$22,199
369,380
kWh
|
$4,876
-
kW-mo/yr
|
|
02 | 2.4221: Install compressor air intakes in coolest locations | $2,414 | $3,000 |
$2,017
33,554
kWh
|
$397
-
kW-mo/yr
|
|
03 | 2.4322: Use or replace with energy efficient substitutes | $10,079 | $12,000 |
$8,264
137,500
kWh
|
$1,815
-
kW-mo/yr
|
|
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $14,232 | $60,000 |
$11,669
194,150
kWh
|
$2,563
-
kW-mo/yr
|
|
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,204 | $4,676 |
$986
16,412
kWh
|
$218
-
kW-mo/yr
|
|
06 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $20,368 | $4,750 |
$17,900
297,840
kWh
|
$2,468
-
kW-mo/yr
|
|
TOTAL RECOMMENDED | $75,372 | $103,426 |
$63,035
1,048,836
kWh
|
$12,337
-
kW-mo/yr
|
||
TOTAL IMPLEMENTED | $35,804 | $69,426 |
$30,555
508,402
kWh
|
$5,249
-
kW-mo/yr
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs