ITAC Assessment: GT0868
ITAC logo
ITAC Assessment: GT0868
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Brake Systems
NAICS 336340: Motor Vehicle Brake System Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 205
Plant Area 100,970
ft2
Annual Production 2,500,000
pieces
Production Hrs. Annual 5,500
hrs
Location (State) Georgia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $441,291 9,273,322
kWh
Electricity Demand $165,048 22,829
kW-mo/yr
Electricity Fees $24,803 -
Natural Gas $152,574 15,474
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $75,372 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $35,804

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings
01 2.4239: Eliminate or reduce compressed air usage $27,075 $19,000 $22,199
369,380
kWh
$4,876
-
kW-mo/yr
02 2.4221: Install compressor air intakes in coolest locations $2,414 $3,000 $2,017
33,554
kWh
$397
-
kW-mo/yr
03 2.4322: Use or replace with energy efficient substitutes $10,079 $12,000 $8,264
137,500
kWh
$1,815
-
kW-mo/yr
04 2.7142: Utilize higher efficiency lamps and/or ballasts $14,232 $60,000 $11,669
194,150
kWh
$2,563
-
kW-mo/yr
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,204 $4,676 $986
16,412
kWh
$218
-
kW-mo/yr
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $20,368 $4,750 $17,900
297,840
kWh
$2,468
-
kW-mo/yr
TOTAL RECOMMENDED $75,372 $103,426 $63,035
1,048,836
kWh
$12,337
-
kW-mo/yr
TOTAL IMPLEMENTED $35,804 $69,426 $30,555
508,402
kWh
$5,249
-
kW-mo/yr
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs