Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

651

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Motor vehicle body and trailer manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
AM0572 #09 Y:2010 Install equipment (eg compactor) to reduce disposal costs $340 -
AM0572 #08 Y:2010 Make a practice of turning off lights when not needed $500 -
AM0572 #07 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $725 $350
AM0572 #06 Y:2010 Eliminate leaks in inert gas and compressed air lines/ valves $800 $400
AM0572 #05 Y:2010 Utilize higher efficiency lamps and/or ballasts $1,025 $460
AM0572 #04 Y:2010 Optimize plant power factor $1,200 $3,250
AM0572 #03 Y:2010 Pay utility bills on time $1,925 -
AM0572 #02 Y:2010 Make a practice of turning off lights when not needed $6,050 -
AM0572 #01 Y:2010 Utilize higher efficiency lamps and/or ballasts $10,200 $34,000
IA0445 #09 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $450 $134
IA0445 #08 Y:2009 Reduce ventilation air $18,248 $20,000
IA0445 #07 Y:2009 Reduce the pressure of compressed air to the minimum required $1,414 $25
IA0445 #06 Y:2009 Eliminate leaks in inert gas and compressed air lines/ valves $6,637 $506
IA0445 #05 Y:2009 Install compressor air intakes in coolest locations $3,180 $560
IA0445 #04 Y:2009 Recover waste heat from equipment $5,460 $100
IA0445 #03 Y:2009 Install occupancy sensors $1,603 $4,551
IA0445 #02 Y:2009 Reduce illumination to minimum necessary levels $962 $81
IA0445 #01 Y:2009 Utilize higher efficiency lamps and/or ballasts $9,949 $19,383
UM0353 #08 Y:2009 Close holes and openings in building such as broken windows $3,526 $1,500
UM0353 #07 Y:2009 Install occupancy sensors $9,160 $6,330