ITAC Assessment: IA0445
ITAC logo
ITAC Assessment: IA0445
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Trailers
NAICS 336212: Truck Trailer Manufacturing
SIC 3715: Truck Trailers
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 105,000
ft2
Annual Production 663
pieces
Production Hrs. Annual 2,080
hrs
Location (State) South Dakota

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $120,494 2,234,770
kWh
Electricity Demand $78,615 6,415
kW-mo/yr
Natural Gas $179,888 18,885
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $47,903 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $9,949 $19,383 $4,317
79,664
kWh
$5,632
-
kW-mo/yr
- -
02 2.7111: Reduce illumination to minimum necessary levels $962 $81 $417
7,706
kWh
$545
-
kW-mo/yr
- -
03 2.7135: Install occupancy sensors $1,603 $4,551 $1,603
29,633
kWh
- - -
04 2.2437: Recover waste heat from equipment $5,460 $100 - - $5,460
-
MMBtu
-
05 2.4221: Install compressor air intakes in coolest locations $3,180 $560 $195
3,600
kWh
$2,985
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,637 $506 $2,978
54,981
kWh
$3,659
-
kW-mo/yr
- -
07 2.4231: Reduce the pressure of compressed air to the minimum required $1,414 $25 $635
11,713
kWh
$779
-
kW-mo/yr
- -
08 2.7314: Reduce ventilation air $18,248 $20,000 - - $18,248
-
MMBtu
-
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $450 $134 - - - $450
-
MMBtu
TOTAL RECOMMENDED $47,903 $45,340 $10,145
187,297
kWh
$13,600
-
kW-mo/yr
$23,708
-
MMBtu
$450
-
MMBtu
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs