ITAC Assessment: UW0027
ITAC logo
ITAC Assessment: UW0027
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2009
Principal Product Treated Paper Products
NAICS 322219: Other Paperboard Container Manufacturing
SIC 2655: Fiber Cans, Tubes, Drums, and Similar Products
Sales Range less than $500
k
# of Employees 26
Plant Area 51,000
ft2
Annual Production 50,000
thousand feet
Production Hrs. Annual 8,760
hrs
Location (State) Washington

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,138 2,686,950
kWh
Electricity Fees $7,619 -
Natural Gas $5,608 425
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $27,310 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,312

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4133: Use most efficient type of electric motors $9,632 $10,324 $9,632
163,274
kWh
02 2.2622: Replace existing chiller with high efficiency model $6,650 $37,000 $6,650
112,718
kWh
03 2.2511: Insulate bare equipment $5,716 $871 $5,716
87,600
kWh
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $5,168 $2,280 $5,168
87,600
kWh
05 2.4231: Reduce the pressure of compressed air to the minimum required $144 - $144
2,453
kWh
TOTAL RECOMMENDED $27,310 $50,475 $27,310
453,645
kWh
TOTAL IMPLEMENTED $5,312 $2,280 $5,312
90,053
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs