Assessment Year | 2009 |
---|---|
Principal Product | fluorescent and HID light fixtures |
NAICS | 335122: Commercial, Industrial, and Institutional Electric Lighting Fixture Manufacturing |
SIC | 3645: Residential Electric Lighting Fixtures |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
285,000
ft2
|
Annual Production | 1,500,000
units
|
Production Hrs. Annual | 4,160
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $213,736 | 3,031,924 |
kWh
|
$0.070 |
Electricity Demand | $98,205 | 7,184 |
kW-mo/yr
|
$13.67 |
Natural Gas | $207,447 | 8,736 |
MMBtu
|
$23.75 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $65,573 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $47,496 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $29,667 | $27,000 |
$10,310
147,274
kWh
|
$19,357
-
kW-mo/yr
|
- | |
02 | 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle | $11,701 | $2,700 | - | - |
$11,701
-
MMBtu
|
|
03 | 2.7261: Install timers and/or thermostats | $5,415 | $180 | - | - |
$5,415
-
MMBtu
|
|
04 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $4,921 | $3,000 | - |
$4,921
-
kW-mo/yr
|
- | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,424 | $1,840 |
$2,825
40,425
kWh
|
$1,599
-
kW-mo/yr
|
- | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,459 | $200 |
$2,160
30,996
kWh
|
$1,299
-
kW-mo/yr
|
- | |
07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,073 | $3,000 |
$1,610
23,087
kWh
|
$1,463
-
kW-mo/yr
|
- | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,952 | $1,000 |
$1,173
16,752
kWh
|
$779
-
kW-mo/yr
|
- | |
09 | 2.7135: Install occupancy sensors | $961 | $420 |
$961
13,726
kWh
|
- | - | |
TOTAL RECOMMENDED | $65,573 | $39,340 |
$19,039
272,260
kWh
|
$29,418
-
kW-mo/yr
|
$17,116
-
MMBtu
|
||
TOTAL IMPLEMENTED | $47,496 | $33,800 |
$15,041
215,083
kWh
|
$27,040
-
kW-mo/yr
|
$5,415
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs