Assessment Year | 2022 |
---|---|
Principal Product | Rolled Sheet Metal |
NAICS | 332322: Sheet Metal Work Manufacturing |
SIC | 3444: Sheet Metal Work |
Sales Range | $10 M to 50M |
# of Employees | 48 |
Plant Area |
218,000
ft2
|
Annual Production | 2,000
pieces
|
Production Hrs. Annual | 2,080
hrs
|
Location (State) | Tennessee |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | ||
---|---|---|---|---|---|
Electricity Usage | $69,223 | 1,001,800 |
kWh
|
$0.069 | |
Electricity Demand | $44,604 | 4,401 |
kW-mo/yr
|
$10.13 | |
Electricity Fees | $7,366 | - |
|
- | |
Natural Gas | $19,486 | 2,638 |
MMBtu
|
$7.39 | |
Waste Disposal Costs | |||||
Water Usage | $653 | 81 |
Tgal
|
$8.03 | |
Water Disposal | $1,212 | 81 |
Tgal
|
$14.89 | |
TOTAL YEARLY COSTS | $142,544 | ||||
RECOMMENDED SAVINGS* | $52,123 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
IMPLEMENTED SAVINGS* | $41,003 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
---|---|---|---|---|---|---|---|---|
01 | 4.663: Level two – install control system using iiot devices with communication capabilities to store data to the cloud | $32,000 | $3,900 | - | - | - | $32,000 | |
02 | 2.9114: Use solar heat to make electricty | $11,120 | $138,300 |
$11,120
146,504
kWh
|
- | - | - | |
03 | 2.7228: Avoid introducing hot, humid, or dirty air into hvac system | $4,496 | $2,400 | - | - |
$4,496
-
MMBtu
|
- | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,458 | $6,147 |
$1,389
18,304
kWh
|
$1,069
-
kW-mo/yr
|
- | - | |
05 | 2.7261: Install timers and/or thermostats | $2,049 | $1,100 |
$2,049
26,996
kWh
|
- | - | - | |
TOTAL RECOMMENDED | $52,123 | $151,847 |
$14,558
191,804
kWh
|
$1,069
-
kW-mo/yr
|
$4,496
-
MMBtu
|
$32,000 | ||
TOTAL IMPLEMENTED | $41,003 | $13,547 |
$3,438
45,300
kWh
|
$1,069
-
kW-mo/yr
|
$4,496
-
MMBtu
|
$32,000 |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs