ITAC Assessment: TT0266
ITAC logo
ITAC Assessment: TT0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Rolled Sheet Metal
NAICS 332322: Sheet Metal Work Manufacturing
SIC 3444: Sheet Metal Work
Sales Range $10
M
to 50
M
# of Employees 48
Plant Area 218,000
ft2
Annual Production 2,000
pieces
Production Hrs. Annual 2,080
hrs
Location (State) Tennessee

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $69,223 1,001,800
kWh
Electricity Demand $44,604 4,401
kW-mo/yr
Electricity Fees $7,366 -
Natural Gas $19,486 2,638
MMBtu
Waste Disposal Costs
Water Usage $653 81
Tgal
Water Disposal $1,212 81
Tgal
TOTAL YEARLY COSTS $142,544
RECOMMENDED SAVINGS* $52,123 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $41,003

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 4.663: Level two – install control system using iiot devices with communication capabilities to store data to the cloud $32,000 $3,900 - - - $32,000
02 2.9114: Use solar heat to make electricty $11,120 $138,300 $11,120
146,504
kWh
- - -
03 2.7228: Avoid introducing hot, humid, or dirty air into hvac system $4,496 $2,400 - - $4,496
-
MMBtu
-
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,458 $6,147 $1,389
18,304
kWh
$1,069
-
kW-mo/yr
- -
05 2.7261: Install timers and/or thermostats $2,049 $1,100 $2,049
26,996
kWh
- - -
TOTAL RECOMMENDED $52,123 $151,847 $14,558
191,804
kWh
$1,069
-
kW-mo/yr
$4,496
-
MMBtu
$32,000
TOTAL IMPLEMENTED $41,003 $13,547 $3,438
45,300
kWh
$1,069
-
kW-mo/yr
$4,496
-
MMBtu
$32,000
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs