Assessment Year | 2009 |
---|---|
Principal Product | Fascias and Wheel Liners/Flares |
NAICS | 336211: Motor Vehicle Body Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $50 M to 100M |
# of Employees | 516 |
Plant Area |
454,699
ft2
|
Annual Production | 3,623,450
pieces
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Michigan |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $1,621,167 | 32,978,005 |
kWh
|
$0.049 |
Electricity Demand | $747,811 | 68,932 |
kW-mo/yr
|
$10.85 |
Natural Gas | $2,270,292 | 226,042 |
MMBtu
|
$10.04 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $301,183 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $252,812 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $186,999 | $237,500 |
$130,173
2,647,963
kWh
|
$56,826
-
kW-mo/yr
|
- | |
02 | 2.2437: Recover waste heat from equipment | $26,834 | $500 | - | - |
$26,834
-
MMBtu
|
|
03 | 2.7313: Recycle air for heating, ventilation and air conditioning | $22,477 | $22,000 | - | - |
$22,477
-
MMBtu
|
|
04 | 2.2437: Recover waste heat from equipment | $22,368 | $3,000 | - | - |
$22,368
-
MMBtu
|
|
05 | 2.4231: Reduce the pressure of compressed air to the minimum required | $16,734 | $200 |
$12,264
249,470
kWh
|
$4,470
-
kW-mo/yr
|
- | |
06 | 2.2211: Use optimum temperature | $13,085 | $200 | - | - |
$13,085
-
MMBtu
|
|
07 | 2.7135: Install occupancy sensors | $9,160 | $6,330 |
$7,956
161,834
kWh
|
$1,204
-
kW-mo/yr
|
- | |
08 | 2.7444: Close holes and openings in building such as broken windows | $3,526 | $1,500 | - | - |
$3,526
-
MMBtu
|
|
TOTAL RECOMMENDED | $301,183 | $271,230 |
$150,393
3,059,267
kWh
|
$62,500
-
kW-mo/yr
|
$88,290
-
MMBtu
|
||
TOTAL IMPLEMENTED | $252,812 | $242,700 |
$130,173
2,647,963
kWh
|
$56,826
-
kW-mo/yr
|
$65,813
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs