Search Recommendations
ITAC logo
Search Recommendations
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.

169

matching recommendations
$
$
ARC 2+ Digits Required
NAICS Heavy duty truck manufacturing
SIC 2+ Digits Required
3+ Characters Required for Products
ID Description Yearly
Savings
Imp
Cost
UA0185 #05 Y:2017 Eliminate leaks in inert gas and compressed air lines/ valves $9,414 $4,645
UA0185 #04 Y:2017 Reduce the pressure of compressed air to the minimum required $3,091 $500
UA0185 #03 Y:2017 Install timers and/or thermostats $9,904 $900
UA0185 #02 Y:2017 Use photocell controls $1,034 $830
UA0185 #01 Y:2017 Utilize higher efficiency lamps and/or ballasts $12,372 $25,579
BD0485 #09 Y:2016 Convert to high volume low pressure (hvlp) paint guns $82,425 $18,000
BD0485 #08 Y:2016 Install occupancy sensors $273 $450
BD0485 #07 Y:2016 Use most efficient type of electric motors $1,569 $3,950
BD0485 #06 Y:2016 Install compressor air intakes in coolest locations $1,726 $1,600
BD0485 #05 Y:2016 Utilize higher efficiency lamps and/or ballasts $2,185 $5,958
BD0485 #04 Y:2016 Reduce the pressure of compressed air to the minimum required $3,599 $20
BD0485 #03 Y:2016 Eliminate leaks in inert gas and compressed air lines/ valves $3,962 $350
BD0485 #02 Y:2016 Utilize higher efficiency lamps and/or ballasts $4,155 $5,111
BD0485 #01 Y:2016 Adjust / maintain fork lift trucks for most efficient operation $33,238 $59,500
CO0717 #07 Y:2015 Recover waste heat from equipment $1,080 $3,220
CO0717 #06 Y:2015 Apply for tax-free status for energy purchases $3,270 $1,000
CO0717 #05 Y:2015 Utilize an evaporative air pre-cooler or other heat exchanger in ac system $3,660 $13,800
CO0717 #04 Y:2015 Utilize higher efficiency lamps and/or ballasts $7,880 $35,080
CO0717 #03 Y:2015 Turn off equipment when not in use $380 $100
CO0717 #02 Y:2015 Eliminate leaks in inert gas and compressed air lines/ valves $470 $480