Assessment Year | 2017 |
---|---|
Principal Product | Refurbished military Vehicles |
NAICS | 336120: Heavy Duty Truck Manufacturing |
SIC | 3711: Motor Vehicles and Passenger Car Bodies |
Sales Range | $10 M to 50M |
# of Employees | 150 |
Plant Area |
215,000
ft2
|
Annual Production | 106
units
|
Production Hrs. Annual | 2,000
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $163,776 | 1,267,575 |
kWh
|
$0.13 |
Electricity Demand | $36,076 | 7,690 |
kW-mo/yr
|
$4.69 |
Electricity Fees | $9,572 | - |
|
- |
Natural Gas | $23,214 | 2,487 |
MMBtu
|
$9.33 |
TOTAL YEARLY COSTS | $232,638 | |||
RECOMMENDED SAVINGS* | $36,157 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,790 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $12,372 | $25,579 |
$9,878
77,378
kWh
|
$2,158
-
kW-mo/yr
|
$336 | |
02 | 2.7134: Use photocell controls | $1,034 | $830 |
$1,006
7,787
kWh
|
- | $28 | |
03 | 2.7261: Install timers and/or thermostats | $9,904 | $900 |
$9,635
74,571
kWh
|
- | $269 | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,091 | $500 |
$2,519
19,496
kWh
|
$488
-
kW-mo/yr
|
$84 | |
05 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $9,414 | $4,645 |
$7,929
61,370
kWh
|
$1,229
-
kW-mo/yr
|
$256 | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $342 | $85 |
$262
1,998
kWh
|
$71
-
kW-mo/yr
|
$9 | |
TOTAL RECOMMENDED | $36,157 | $32,539 |
$31,229
242,600
kWh
|
$3,946
-
kW-mo/yr
|
$982 | ||
TOTAL IMPLEMENTED | $10,790 | $5,560 |
$9,197
71,155
kWh
|
$1,300
-
kW-mo/yr
|
$293 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs